IHC Parts & Services, part of IHC Merwede, and Wärtsilä Netherlands (WNL) have teamed up to provide life-cycle support for ships with Bolnes and Smit Bolnes engines. The companies will combine their industry knowledge, expertise and strength to maintain these dredging and other vessels worldwide in
Two SeaEnergy sites – Beatrice and Inch Cape – are among 10 identified as the short term option (2010 – 2020) for developing offshore wind. [mappress] Source: bfnnews, May 19, 2010;
Stefan Aarninkhof (Royal Boskalis Westminster) and his colleagues at EcosShape | Building with Nature, Jan van Dalfsen and Jan Mulder (both Deltares) and Daan Rijks (DHV Consultants, now Royal Boskalis Westminster) won the Award for their paper entitled “Sustainable Development of Nourished Shorelin
The Board of Golar LNG Energy Limited (“Golar” or the “Company”) is pleased to announce that the Company, in line with its stated strategy… [mappress] Source: 4-traders, May 19, 2010;
Leading manufacturer of sonar seabed survey equipment, GeoAcoustics Ltd, recently released the GeoSwath Plus Compact for wide swath bathymetry. This new shallow water multibeam and side scan system is based on the most successful phase measuring bathymetric sonar in the market, the Geoswath Plus. Ge
On 6 May 2010 Höegh LNG and Kellogg Brown & Root [KBR] executed an agreement for the long term cooperation within the LNG FPSO segment… [mappress] Source: euroinvestor, May 18, 2010;
A guide to cost standards for dredging equipment 2009 gives the replacement value for ex-works, yard or importer and exclusive of VAT, in… [mappress] Source: IADC, May 18, 2010
Invensys Operations Management, a global provider of technology, software solutions and consulting services to the process and manufacturing… [mappress] Source: technologynewsroom, May 18, 2010
6,000 MW of offshore wind energy are expected to be installed by 2020. The tender for the first 3,000 MW wind turbines should take place in… [mappress] Source: evwind, May 16, 2010;
6,000 MW of offshore wind energy are expected to be installed by 2020. The tender for the first 3,000 MW wind turbines should take place in… [mappress] Source: evwind, May 16, 2010;
Mason County commissioners will continue to research the controversial proposal that would result in large wind turbines in Lake Michigan. [mappress] Source: mlive, May 15, 2010;
The structure in Lake Ontario off Grey Abbey Park is hard to miss, but it’s still not the wind testing anemometer. The platform on which the… [mappress] Source: insidetoronto, May 13, 2010;
General Electric offers 4.0 MW Offshore Wind Turbine. This wind turbine model is built utilizing a permanent magnet generator providing… [mappress] Source: azocleantech, May 13, 2010;
Offshore looks like the next big expansion area for the wind industry. Conventional ideas extended to offshore tasks will mount turbines on… [mappress] Source: windpowerengineering, May 13, 2010;