Scientists and engineers of the Alfred Wegener Institute, Helmholtz Centre for Polar and Marine Research (AWI) are currently starting work on a long-term observatory with observation stations from the Norwegian Sea to the Arctic Ocean. In the coming years, the AWI researchers intend to upgrade their
John Weston, Member of Parliament for West Vancouver–Sunshine Coast–Sea to Sky Country, on behalf of the Honourable Greg Rickford, Canada’s Minister of Natural Resources and Minister for the Federal Economic Development Initiative for Northern Ontario, has announced an investment of $1.5 million und
Based on the detailed investigation and new measurement technology described by a research team led by GEOMAR Helmholtz Centre for Ocean Research Kiel, the turnover of organic matter and nutrients at the sea floor as well as future changes within the dynamic ecosystem can be better assessed. Althoug
Early in September, a team of Canadian underwater archaeologists discovered the wreck of the HMS Erebus in the eastern stretches of the Queen Maud Gulf off the coast of Canada. As part of the search, the team used an array of state-of-the-art technology, including advanced sonar devices, remotely op
BMT Isis, a subsidiary of BMT Group Ltd (BMT) and a leading supplier of safety and environmental risk management across sectors and Plymouth based MSubs Ltd, a principal supplier of manned and unmanned underwater submersibles for both military and commercial users are collaborating together to devel
Subsea World News has put together a recap of the most interesting articles from the previous week (October 13 – October 19). The boss of a major airline believes missing flight MH370 may not have crashed in the Indian Ocean, and that probably control was taken of that airplane. In an [&hell
Research into the optimal design for ocean wave energy converters is set to enter the next phase thanks to a partnership between Perth-based Bombora Wave Power and the Australian Maritime College. In conjunction with Bombora’s financial commitment, a $256,000 Australian Research Council Linkage Prog
Research into the optimal design for ocean wave energy converters is set to enter the next phase thanks to a partnership between Perth-based Bombora Wave Power and the Australian Maritime College (AMC). In conjunction with Bombora’s financial commitment, a $256,000 Australian Research Council Linkag
The Finnish Transport Agency intends to conduct a hydrographic survey in the Finnish EEZ, territorial waters and inland waters. The work scope of the project consists of multibeam echo sounder system hydrographic survey on shipping routes, as well as the aerial surveys. The project is planned to be
Fugro is to fund the creation of a new ‘Fugro Chair in Geotechnics’ at the University of Western Australia’s Centre for Offshore Foundation Systems (COFS). The agreement, which also provides funding for three PhD scholarships, was signed by Professor Robyn Owens, UWA’s Deputy Vice-Chancellor (Resear
ASV and Planet Ocean are investigating how Autonomous Surface Vehicles (ASVs) can be used to reduce the cost of tasks related to the construction, operation and maintenance (O&M) of offshore wind farms. The project, funded by GROW:OffshoreWind and supported by the Knowledge Transfer Network (KTN), w
German Federal Maritime and Hydrographic Agency (BSH) has revealed that the noise created during the construction of offshore wind farms is pretty much in line with BSH’s limit, which has been set to protect harbor porpoises. “We have seen some noticeable progress in the reduction of noise levels du
Drilling of exploration well 7220/11-1 on the Alta prospect in production licence (PL) 609 in the Barents Sea is in the process of being successfully completed. The well is located 20 km northeast of the Gohta discovery and some 160 km from the Norwegian coastline. “This is a breakthrough discovery.
RES Offshore has successfully completed its first Engineer Procure Construct (EPC) contract for the design and installation of Met Mast for the West of Duddon Sands Offshore Wind Farm. Having been awarded the contract in June 2013, RES has project managed the design, fabrication and installation of