JP Kenny Norway has signed a Front End Engineering Design (FEED) contract with Norske Shell for the high temperature, high pressure Linnorm project in Norway. Valued at approximately US$9 million (NOK 55 million), this contract forms part of a global Enterprise Frame Agreement awarded to Wood Group
TGS has entered into new data release agreements with the UK Department of Energy and Climate Change (DECC) and the British Geological Survey (BGS). These agreements permit TGS to release new and historical data for all onshore and offshore wells in the UK. The well data, once captured and quality c
International oilfield services company Expro has once again been recognised for its outstanding safety record globally. Expro has been commended in the oil & gas industry sector of the annual 2012 Royal Society for the Prevention of Accidents (RoSPA) safety awards. Expro has received awards from Ro
Nautronix have secured another order for the supply of their NASDrill RS925 deepwater acoustic positioning system for Noble Corporation’s fourth new ultra-deepwater drillship. In 2011, Nautronix was awarded the contracts for supplying their NASDrill RS925 system for Noble’s first three new drill shi
ABB, the leading power and automation technology group, recently won an order worth $18 million from Daewoo to supply energy efficient propulsion and electrical power systems for two new deep sea pipeline installation vessels that will build oil transport infrastructure off the coast of Brazil. The
In a joint project with NERACOOS, U.S. IOOS, the University of Maine’s School of Marine Sciences and Houston-based Sonardyne Inc., a Wave Glider has been launched near Monhegan Island in the Gulf of Maine. Over a period of 6 to 8 weeks it will collect information on water conditions in the Gulf of M
Statoil transfers operatorship of the Vilje field in the North Sea to Marathon Oil Norge. The agreement does not involve any change of stakes in the production licence (PL 036D). “Statoil is interested in good area solutions. We therefore find it natural that Marathon, as the biggest operator in the
Aker Solutions is acquiring the mechanical workshop company Lyngdal Mek. Verksted (LMV), thereby increasing its capacity to assemble, test and overhaul drilling equipment especially for the North Sea market. This is the second recent acquisition by Aker Solutions’ drilling technologies business in i
Oceana has identified Klints Bank and the area East of Gotland as one of the locations in need of protection. As part of its 2012 Baltic Expedition, the marine conservation organization has been conducting extensive research in the past few days to bolster data collected in this same area during las
Cecon ASA presents its Consolidated Interim Financial Report for First Quarter 2012. Highlights of Q1 2012: Highlights of the quarter Q1/2012 • Successful completion of installation offshore Nigeria • Revenues Q1: NOK 93.4 million • EBITDA: for Q1 NOK 22.9 million • Pro forma result: Profit after ta
The Norwegian subsea entrepreneur Ocean Installer awards a frame contract for the delivery of Remotely Operated Vehicle (ROV) services to Oceaneering. The frame contract is of five years fixed duration with options, and covers the supply of ROV services and related personnel for Ocean Installer’s cu
Guernsey Electricity is using a cable ship to pinpoint a fault on submarine cable linking Guernsey and Jersey to France, reports BBC. The France telecom owned Leon Thevenin vessel is expected to be in the area all week. According to BBC, Guernsey Electricity’s corporate strategy director, Sally Davi
A purpose-designed BOP handling system comprising twin air-operated monorail hoists, with a joint lifting capacity of 200 tonnes has been supplied by J D Neuhaus. These hoists are a special compact design which has been developed to suit on-site operational requirements and each hoist represents a 4
Total is today able to announce that a well intervention operation has stopped the G4 well leak on the Elgin complex, 240km from Aberdeen in the UK North Sea. The well intervention operation, which involved pumping heavy mud into the leaking well, began on May 15th and the leak was stopped 12 hours