A comparative patent analysis between the leading offshore wind nations: Denmark, England and Germany, has set the German offshore wind industry as a clear frontrunner in the field of innovation. The subsidiary of Wind Energy Agency WAB e.V., germanwind GmbH, came to this conclusion after examining
Hyosung Corporation installed the aeroMaster 5.0 offshore wind turbine, developed by aerodyn Energiesysteme GmbH in Germany, on Jeju Island, South Korea, on February 24. The wind turbine with a rotor diameter of 139 m and 5 MW power has a high-speed drive train with a medium voltage generator. The t
A Sealite Nautilus ocean buoy with 3-5NM+ marine lantern was recently installed at the Scroby Sands Wind Farm, 2.5km off the coast of Great Yarmouth in eastern England. The North Sea has some of the busiest shipping lanes in the world, and with on-going development of energy resources in the area,
GE Power Conversion has announced the successful trials of PassiveBoost™, the technology which will allow remote power networks to go DC. This is an important step in lowering the cost of power delivered from offshore installations and increasing the electrical output delivered from renewable energy
Bechtel, a global leader in planning, designing, and building port and marine projects, has been selected by LIGTT Project Company LLC to provide management services for the pre-construction of the Louisiana International Gulf Transfer Terminal. The innovative new cargo transfer terminal off Louisia
Caterpillar has announced that its new Cat® 323 excavators will come equipped with fuel and labor-saving Cat Grade Control as standard equipment. The technology is a factory-integrated system that helps operators get to grade quickly, efficiently, and accurately using real-time positioning and cut-a
Over the past fiscal year (Oct. 1, 2012 to Sept. 30, 2013), the U.S. Environmental Protection Agency (EPA) Region 4 has cited 23 entities throughout the Southeast for depositing dredged and/or fill material into wetlands or other waters of the United States in violation of Section 404 of the Clean W
European countries need to join forces to manage flood risks in the future. By 2050, the financial losses caused by floods may exceed current levels five times over. That is the conclusion of a study from the VU University in Amsterdam involving Deltares. This European research project linked four t
U.S. President Obama’s budget proposal for fiscal year 2015 (FY15) includes funding for ongoing projects in the U.S. Army Corps of Engineers, Wilmington District. The $49.5 million designated for Wilmington District projects continue funding for conduct of one study, construction activities, and ope
Regarding the Rathbun Lake Project, the U.S. Army Corps of Engineers will host a workshop on Wednesday, March 19, to present information regarding current water management operations and the influence of recent and anticipated future trends. The Corps officials are planning to revise the 1980 versio
The Victorian Coalition Government is investigating the strategic and commercial options for the future of Victoria’s state-owned ports, Treasurer Michael O’Brien confirmed today. “The Coalition Government is carefully considering the future of Victoria’s port assets to ensure they deliver the best
Experts from Bachmann electronic GmbH and Bachmann Monitoring GmbH will be presenting innovative hardware and software solutions for the international wind energy industry at this year’s annual conference of the European Wind Energy Association (EWEA) from 10 to 13 March 2014. At Bachmann electronic
The U.S. President Obama’s Budget for fiscal year 2015 (FY15) included $4.561 billion in gross discretionary funding for the Civil Works program of the U.S. Army Corps of Engineers (USACE), which is offset in part by a proposal to cancel $28 million in unobligated carryover of funds previously appro
Enbridge plans to continue unfinished dredging works at three major impoundment areas, including Morrow Lake and Delta in 2014. Because the Company failed to complete the required dredging, under the EPA’s March 14, 2013, order, by Dec. 31, 2013, the Comstock Township dredge pad construction is plan