ABS Group will present Vattenfall Wind Power Ltd with the Certified Design Basis Verification for the Kentish Flats Extension Offshore Wind Farm Project. The project, which has been successfully completed, will be located off the North Kent coast, adjacent to the existing Kentish Flats Wind Farm. Al
Large Diameter Drilling (LDD), an Acteon company, has won a contract to supply drilling equipment and personnel for the delivery of foundation installation services at Liverpool 2, the new deepwater container terminal for the UK port. The contract is part of a major initiative to expand Liverpool’s
The dredger “MOUSTAKBAL II”, designed and built entirely by Nodosa Shipyard, with capacity of 1,500 m3 and the biggest of its kind ever built in Spain, was launched today. This vessel reaches a more precise and rapid unloading of dredged material, and is especially intended for the extraction of san
Vestas has received a firm and unconditional order for 15 V112-3.3 MW offshore turbines for the extension of the Kentish Flats wind farm off the coast of the UK. Vattenfall has contracted Vestas for the supply, installation and commissioning of the wind turbines as well as a 5-year service and maint
Fundy Ocean Research Center for Energy (FORCE) has installed a data cable designed to connect to a recoverable underwater research platform – the first subsea cable ever installed in the Minas Passage. The cable installation provides valuable knowledge and experience in planning the deployment of fo
Novorossiysk Commercial Sea Port Group announced today that its subsidiary Baltic Stevedore Company has completed a key phase in the construction of warehouse facilities as part of a project to build a 400 ths TEU per year container terminal BSC. The expansion of warehousing territory to 5.6 hectare
Vroon Offshore Services BV has announced that VOS Satisfaction, a DP1/4PM subsea‑support vessel, is to work on TenneT’s HelWin 2 project. The vessel will be employed on the second phase of the marine Unexploded Ordnance (UXO) survey program . Read more about second phase of TenneT’s UXO survey HERE.
The U.S. Army Corps of Engineers, St. Paul District, published an announcement of its intent to accept funds from the Wild Rice Watershed District for the purpose of expediting Corps review and approval of a modification of a portion of the existing Corps of Engineers Wild Rice – Marsh River channel
Queensland’s Coordinator General has approved the proposed $390 million Gold Coast International Marine Precinct project on the Coomera River, subject to the proponent meeting a number of stringent environmental and operational conditions. The proposal by Harbour Island Pty Ltd is to develop a 63.5
Dredge Central LLC (DC) announced that it has acquired certain of the dredge assets previously owned by Dredge and Marine Company LLC (DMC), perhaps the most significant of which is the Dredge & Pit Trader listing service for used dredgers and used marine equipment, pumps, boosters, pipeline, and dr
Deltares has signed an agreement with four Kenyan parties to work together in the field of sustainable water and soil management. Deltares and the four Kenyan organisations will be sharing their expertise in the field of water, the subsurface and infrastructure. Kenya faces challenges with water res
ACI’s Next Generation Vessel Maintenance (29-30 January 2014, London, UK) will be a provocative, stimulating and exciting gathering, grouping fleet owners and crucial stakeholders all sharing the common aim of maintaining fleet asset integrity with maximum profitability. The two-day meeting will tak
Tau Morwe, Chief Executive of Transnet National Ports Authority (TNPA), has been confirmed as a keynote speaker at the 3rd Cool Logistics Africa conference, taking place in Cape Town, South Africa on 4-6 March 2014. As one of the five divisions of Transnet Ltd, South Africa’s national transport oper
The key project at the Ilyichevsk seaport (Odessa region) in the coming years will be dredging the approach channel to the port and the port’s waters to 15 meters, and, if necessary, to 17 meters in in the future. The port’s board approved this priority in the Plan for Development of the Port until