Gurit, a leading global supplier of composite materials and technical solutions to the wind energy, transportation, tooling, marine markets and other selected application areas congratulates ANDRITZ HYDRO Hammerfest who has successfully achieved supply of power to the grid from their HS1000 device.
Because of doubts about the original design of the new harbour built in Sal Rei on the Cape Verdean island Boa Vista, the Cape Verdean client asked Royal Haskoning and Deltares to produce, test and optimise a new design. The harbour is vital for the ongoing development of tourism on the island. Stor
The first direct measurement of wind over the Great Lakes at the height of commercial turbines comes from a six-ton buoy loaded with scientific equipment. The buoy was deployed at three locations in the lake: two points near the Muskegon shoreline and about 35 miles off shore. The project was led by
Aberdeen-based Hydro Group, a designer and manufacturer of underwater cables and connectors for global subsea, topside and onshore applications, has been awarded £1million in financial support from the European Commission’s Research Executive Agency (REA). The company predicts a 20% increase in turn
Even though the tidal power technology gives hope, it is still unproven because of many challenges. In a recently released new marine renewable energy strategy, the NDP government states that the tidal power potential exists but that it requires ambitious and costly measures to make use of it. Accor
Even though the tidal power technology gives hope, it is still unproven because of many challenges. In a recently released new marine renewable energy strategy, the NDP government states that the tidal power potential exists but that it requires ambitious and costly measures to make use of it. Accor
Trident Energy, the independent developer of generator solutions for the offshore renewable energy industry, announced that it has been awarded a Scottish Enterprise SMART: SCOTLAND R&D grant to help fund the forthcoming sea trials of its linear generator technology. Together with on-going commitmen
At 2012, Ibercisa will continue to emphasize the advantages of electrically driven deck equipment, definitely one of the big technological advances in this field. The electronic system will greatly affect a vessel’s efficiency and running costs by reducing fuel costs. Ibercisa will also give special
BioSonics offered a preview of an entirely new technology in March at the Oceanology International (OI) exhibition in London. The MX Aquatic Habitat Echosounder has now been widely released and the response to this habitat assessment and mapping system has been strong, with immediate orders generate
BlueView Technologies, the world leader in compact acoustic imaging and measurement technology, has updated the operating software for its 2D and 3D sonar systems. ProViewer™ 3.6 and ProScan™ 3.6 include multiple updates to improve processing speed and ease of use. Additionally, BlueView is introduc
Fermin Catalán, Chief Engineer for the Gamesa’s new G11X offshore turbine, a 5-MW platform, has been named the wind innovator 2012, Windpower Engineering news portal reports. “My first experience with renewable energy came from my brothers who built a parabolic solar collector for fun,” says Mr Cata
The number of employees in offshore wind industry in Germany rose from 6,900 employees in 2010 to 8,600 in 2011. The Federal Government said that the offshore wind energy is a new technological sector, for which there are no specific education and training programs. There were initial approaches and
DeTect has completed the installation of the MERLIN Avian Radar System at the wind farm substation on Thornton Bank, reports Windtech International. Last year in January, the Management Unit of the North Sea Mathematical Models (MUMM) acquired the radar system to track the bird movement along the co
An important part of the TAP service is the provision of trained, expert operators who are able to ensure that the Echoscope™ is operating optimally as soon as it’s installed, and is providing imagery and recorded data to suit the customer’s requirements. In order to meet the level of demand that th