Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
Business & FinanceEquipmentVesselsResearch & DevelopmentHuman CapitalOperations & Maintenance
Maputo Port Dredging Set for Mid-May
Technology

Maputo Port Dredging Set for Mid-May

The dredging of the Port of Maputo’s access channel is estimated to begin in mid-May and will be executed by Jan De Nul Dredging Middle East FZE, UAE, according to the Maputo Port Development Company (MPDC). The dredging operations will last 10 months, including mobilization and demobilization of th

about 10 years ago
Royal IHC Delivers Trailing Suction Hopper Dredger Mahury
Technology

Royal IHC Delivers Trailing Suction Hopper Dredger Mahury

Royal IHC delivered the trailing suction hopper dredger Mahury to Baggerbedrijf de Boer – Dutch Dredging on February 18, 2016. The 1,840m3 twin-screw TSHD was built at IHC’s partner shipyard, MTG Dolphin, in Varna, Bulgaria. The Mahury was successfully launched on 14 August and named on 29 October 2

about 10 years ago
VIDEO: ACETube Dewatering System Introduced
Technology

VIDEO: ACETube Dewatering System Introduced

ACE Geosynthetics, a manufacturer of geosynthetic fabric and geosynthetic products, such as geogrid and geotextile, has just released a video about their ACETube® (Geotextile Tube) Dewatering System, that can make dredging faster and more efficient. ACETube® is integrated with single or multiple pie

about 10 years ago
VIDEO: FLiDAR 6M Braving North Sea Winter Storm
Technology

VIDEO: FLiDAR 6M Braving North Sea Winter Storm

Canada-based Axys Technologies has recently shared a video showing its FLiDAR 6M, formerly known as the WindSentinel, navigating the rough seas at the Fino1 Met Mast off the coast of Germany. The FINO1 Met Mast is situated in the North Sea, approximately 45 kilometres to the north of Borkum,and in a

about 10 years ago
Panama Canal Expansion Program 96 Percent Complete
Technology

Panama Canal Expansion Program 96 Percent Complete

The largest infrastructure project since the waterway’s original construction, the Panama Canal Expansion Program, is now 96 percent complete. The Pacific access channel is 99 percent complete and the third set of locks is now 95 percent complete. When fully complete, the new set of locks will doubl

about 10 years ago
Great Lakes Dredge & Dock Reports Year-End Results
Technology

Great Lakes Dredge & Dock Reports Year-End Results

Great Lakes Dredge & Dock Corporation today reported financial results for the quarter and year ended December 31, 2015. For the three months ended December 31, 2015, Great Lakes reported revenue of $222.6 million, net loss from continuing operations of $0.8 million and Adjusted EBITDA from continui

about 10 years ago
VIDEO: Dredge Ball Joints – Engineering and Manufacturing
Technology

VIDEO: Dredge Ball Joints – Engineering and Manufacturing

Dredge Yard, an international producer of mining/dredging components and equipment, has just released this very interesting video about the engineering and manufacturing of their dredge ball joints. The dredge ball joints are designed in six different types, giving variations of tilting angle from 1

about 10 years ago
Scotrenewables’ FloTEC bags €10M from Horizon 2020
Technology

Scotrenewables’ FloTEC bags €10M from Horizon 2020

The European Commission’s research and innovation programme, Horizon 2020, has awarded a grant of €10 million (£7.75 million) to advance the commercialisation of Scotrenewables’ floating tidal energy technology. The Floating Tidal Energy Commercialisation (FloTEC) project will advance Scotrenewables

about 10 years ago
Carbon Trust backs renewables testing in Japan
Technology

Carbon Trust backs renewables testing in Japan

The Carbon Trust is working as part of a consortium created to progress the development of tidal and floating wind energy test centre in Japan. The Carbon Trust has been working closely with both the Wind Energy Institute of Tokyo and the Nagasaki Marine Industry Cluster Promotion Association on the

about 10 years ago
ORE Catapult, EMEC join forces for marine technology development
Technology

ORE Catapult, EMEC join forces for marine technology development

Offshore Renewable Energy (ORE) Catapult and EMEC have launched Technology Assessment Process (TAP) to de-risk marine energy technology development. TAP has been designed to support wave and tidal energy technology developers, enabling them to benchmark their technologies and follow a more structure

about 10 years ago
Scotland marine energy presses forward
Technology

Scotland marine energy presses forward

Scottish Enterprise has announced the successful completion of a number of key projects in the marine energy sector. Supported by £4.8 million of grants from the Scottish Enterprise Marine Energy RD&D Fund programme, Scotland continues to advance the marine energy sector through the completion of th

about 10 years ago
Carbon Trust Helping Develop Nagasaki RE Testing Centre
Technology

Carbon Trust Helping Develop Nagasaki RE Testing Centre

The Carbon Trust is working as part of a consortium set up to progress the development of a tidal and floating wind energy test centre in the Nagasaki Prefecture, Japan. The Nagasaki Prefecture has been identified as a potential location for the offshore renewable test site, to not only take advanta

about 10 years ago
Carbon Trust Helping Develop Nagasaki RE Testing Centre
Technology

Carbon Trust Helping Develop Nagasaki RE Testing Centre

The Carbon Trust is working as part of a consortium set up to progress the development of a tidal and floating wind energy test centre in the Nagasaki Prefecture, Japan. The Nagasaki Prefecture has been identified as a potential location for the offshore renewable test site, to not only take advanta

about 10 years ago
Tidal array cable laying project finalized
Technology

Tidal array cable laying project finalized

The final phase of a major project to investigate cost-effective methods of cable laying for tidal power arrays, with the aim of helping accelerate development of the marine energy industry, has been completed in Orkney. Funded by Scottish Enterprise, the £2.4 million Tidal Array Cabling Solution pr

about 10 years ago
  • 1
  • …
  • 810
  • 811
  • 812
  • …
  • 1370