One of the two dredges that have been pumping sand onto Nags Head beaches since May has been sent to Norfolk for engine repairs, according… By Erin James (hamptonroads) [mappress] Source: hamptonroads, July 1, 2011;
A building site in the heart of the city of Rotterdam challenged the currently available dredging tools. Contractor Martens & van Oord needed to remove clay but was hindered by the presence of piles. Damen Dredging Equipment made a special cutter head meeting the tight schedule. The project concerne
The Mekaines LNG carrier, with a capacity of 266,000 cubic metres, is due to arrive in the UK’s South Hook terminal July 5, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic metre
FMC Technologies, Inc. announced that it has signed an agreement with Shell Development (Australia) Pty. Ltd. to supply subsea production and associated topside systems for the Prelude field development. The companies also announced an aftermarket agreement that will result in FMC Technologies Austr
After years of inordinate delay, the Jammu and Kashmir Government on Saturday signed an agreement for procuring state-of-the-art dredgers… BY ARIF SHAFI WANI (greaterkashmir) [mappress] Source: greaterkashmir, June 27, 2011;
SBM Offshore announced that it has been awarded a contract and received the corresponding notice to proceed from Technip (part of the “TSC” Consortium with Samsung Heavy Industries) for the engineering, procurement, construction and integration (EPCI) of a major Turret Mooring System. This Turret Mo
The Murwab LNG carrier, with a capacity of 210,100 cubic metres, is due to arrive in the UK’s Dragon terminal July 2, according to the Milford Haven Port Authority website. BG and Petronas between them have contracted for the full capacity at Dragon LNG’s Milford Haven site over the next 20 years. B
The Al Kharaitiyat LNG carrier, with a capacity of 216,000 cubic metres, is due to arrive in the UK’s South Hook terminal July 2, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic
Russian gas producer Novatek plans to build a new type of LNG tanker, designed for big-scale year-round shipping in the Arctic… (barentsobserver) [mappress] Source: barentsobserver, June 23, 2011;
The Lijmiliya LNG carrier, with a capacity of 263,000 cubic metres, is due to arrive in the UK’s South Hook terminal June 29, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic met
Tsakos Energy Navigation Ltd. (TEN) today announced a four year time charter for the 2007-built 150,000 m(3) LNG carrier Neo Energy to a major international energy concern. The charter is expected to commence in the first quarter of next year upon expiration of the vessel’s existing employment. This
Damen Dredging Equipment has delivered 4 cutter suction dredgers to the Iraqi Ministry of Water Resources. The Ministry, who already had several Damen dredgers in their fleet, will use the dredgers for maintenance dredging on the rivers and throughout the central plains. The 4 cutter suction dredger
OSD-IMT, the UK arm of Offshore Ship Designers, has been chosen by Samsung and Boskalis-SMIT Engineering to develop the basic design, detailed design and production drawings for a 99 m cable laying vessel. Neil Patterson, managing director of OSD-IMT, says, “This project illustrates perfectly the st
On 17 June 2011 at the St. Petersburg International Economic Forum, Sovcomflot – the largest operator of ice-class LNG tankers – signed a contract with Gazprom Global LNG Limited (GGLNG), a subsidiary of Gazprom, for the long-term time charter of two ultra-modern ice-class LNG-carriers. The long-ter