Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Eni names FPSO for East Hub development. ‘Armada Olombendo’ to set sail soon
FPSO

October 14, 2016 · about 10 years ago

Eni names FPSO for East Hub development. ‘Armada Olombendo’ to set sail soon

Italian oil company Eni has informed that the naming ceremony of the Armada Olombendo floating production storage and offloading (FPSO) vessel was held on Friday in Singapore. The FPSO will operate in Block 15/06, offshore Angola, for the East Hub Development Project. The Italian oil company said on

1 minutes read
  • LinkedIn
  • X
  • Email

Italian oil company Eni has informed that the naming ceremony of the Armada Olombendo floating production storage and offloading (FPSO) vessel was held on Friday in Singapore.

The FPSO will operate in Block 15/06, offshore Angola, for the East Hub Development Project.

The Italian oil company said on Friday that the vessel will soon be ready to sail to its final destination where, once in position, will start mooring and hook-up operations.

According to Eni, the first oil from the East Hub Development Project is planned by the first half of 2017. This follows the stream of start-ups in the West Hub Project, in the same Block 15/06, which is the only Block of those awarded in the 2006 bid round that has achieved production.

The East Hub Development Project encompasses 9 subsea wells, of which 5 are producers and 4 are water injectors, in water depth ranging between 450 and 550 meters. The hydrocarbons which are produced from these wells will be transported via a pipeline system to the FPSO to be treated and stored prior to export.

Eni is the operator of Block 15/06 with a 36.84% stake. The other partners in the joint venture are Sonangol Pesquisa e Produção (36.84%) and SSI Fifteen Limited (26.32%).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free