Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›ABB installs electrical system on Brazil-bound FPSO
FPSO

December 1, 2016 · about 9 years ago

ABB installs electrical system on Brazil-bound FPSO

ABB, power and automation technology group, has installed a prefabricated solution for the electrical system on a floating production storage and offloading unit being built in Singapore. Upon completion, the Modec-built FPSO Cidade de Campos dos Goytacazes MV29 will be deployed at the deepwater Tar

2 minutes read
  • LinkedIn
  • X
  • Email

ABB, power and automation technology group, has installed a prefabricated solution for the electrical system on a floating production storage and offloading unit being built in Singapore.

Upon completion, the Modec-built FPSO Cidade de Campos dos Goytacazes MV29 will be deployed at the deepwater Tartaruga Verde and Tartaruga Mestiça fields, located about 112 kilometers offshore Macaé, in the State of Rio de Janeiro, Brazil.

Petrobras, the operator of the field, will charter the FPSO under a 20-year deal.

The FPSO will be moored in 765 meters of water depth and will be capable of accommodating up to 62 risers and umbilicals.

The FPSO Cidade de Campos dos Goytacazes MV29 is the twelfth FPSO unit that Modec will provide for Brazilian fields, tenth for Petrobras, and the ninth collaboration between ABB and Modec.

When operational towards the end of 2017, it will be capable of processing 150,000 barrels of crude oil, compressing 176 million cubic feet of gas a day and will have a storage capacity of about 1,600,000 barrels. It will also be able to inject 200,000 barrels of water a day into the reservoirs.

ABB said on Thursday that all of these operations would be powered by the company’s electrical system supplied in the form of E-house, a modular structure that arrived on site with medium and low-voltage switchgear and transformers already installed.

The company added that the module weighs close to 1,000 tons and is equipped with lighting, heat tracing, fire suppression, and heating and ventilation systems.

Paul Singh , HUB BU manager of Oil, Gas and Chemicals business in Singapore, said: “The complete and timely delivery of our part of this project is a testimonial to our commitment to taking ownership of our projects, improving schedule and minimizing risks.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOEquipmentInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free