Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Libra FPSO named in Singapore (GALLERY)
Infrastructure

December 5, 2016 · about 9 years ago

Libra FPSO named in Singapore (GALLERY)

The naming ceremony for the floating production offloading and storage (FPSO) unit Pioneiro de Libra took place on Friday, December 2 at Sembcorp Marine’s Jurong Shipyard in Singapore where the conversion of the Libra FPSO has been taking place since 2014. The FPSO is owned through a 50/50 joint ven

2 minutes read
  • LinkedIn
  • X
  • Email

The naming ceremony for the floating production offloading and storage (FPSO) unit Pioneiro de Libra took place on Friday, December 2 at Sembcorp Marine’s Jurong Shipyard in Singapore where the conversion of the Libra FPSO has been taking place since 2014.

The FPSO is owned through a 50/50 joint venture between Odebrecht Oil & Gas and Teekay Offshore (OOGTK joint venture). Jurong won the contract to convert a shuttle tanker into FPSO for the Libra field in October 2014.

The unit, which used one of Teekay Offshore’s former shuttle tankers, the Navion Norvegia, will operate on the Petrobras-operated large Libra pre-salt field in the Santos Basin offshore Brazil with estimated reserves of 8 to 12 billion barrels and currently considered to be the largest oil field offshore Brazil.

FPSO Pioneiro de Libra, initially scheduled for completion in the third quarter of 2016, can operate at water depths of up to 2,400 meters, with a production capacity of 50,000 barrels of oil per day and daily compression capacity of four million cubic meters of gas.

According to Teekay, more than four thousand people were involved in the project over the last two years, including more than 16 million man-hours of shipyard activities, without a single lost-time injury.

“Our strong joint venture partnership with OOG and the way we have worked hand in hand with Jurong, Petrobras and their partners all demonstrate strong teamwork, which is one of Teekay’s core values,” said Chris Brett , President of Teekay Offshore Production.

“We are very proud of both the safety standards and safety performance on this project. We are also very honored that our FPSO will be the first to produce oil from Brazil’s massive Libra field and will contribute significantly to our future cash flows,” said Kenneth Hvid , Teekay Corporation’s CEO-elect and President and Chief Executive Officer, Teekay Offshore Group Ltd.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago