Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Petronas’ first FLNG unit produces LNG
Infrastructure

December 9, 2016 · about 9 years ago

Petronas’ first FLNG unit produces LNG

Malaysian oil and gas company Petronas has reported that the floating LNG (FLNG) unit SATU produced its first LNG from the Kanowit gas field, offshore Sarawak on December 5, 2016. PFLNG SATU made its 2,120 nautical mile journey from Okpo, South Korea to the Kanowit gas field in May this year for the

1 minutes read
  • LinkedIn
  • X
  • Email

Malaysian oil and gas company Petronas has reported that the floating LNG (FLNG) unit SATU produced its first LNG from the Kanowit gas field, offshore Sarawak on December 5, 2016.

PFLNG SATU made its 2,120 nautical mile journey from Okpo, South Korea to the Kanowit gas field in May this year for the offshore phase of commissioning. The floating facility achieved its first gas milestone in November.

The gas is treated and liquefied via its Nitrogen-based Liquefaction Unit – the heart of PFLNG SATU, and processed into the first drop of LNG.

Petronas’ Acting Vice President LNG Assets, Development & Production Adnan Zainal Abidin said the first drop of LNG from PFLNG SATU has realized the technological aspirations of the company to tap hydrocarbons and produce LNG close to the source.

“At 365 meters long and with 22 modular systems, PFLNG SATU is an engineering marvel that brings together the liquefaction, production, storage and offloading processes of LNG to the offshore gas field,” Adnan Zainal Abidin said.

The company said that, with a processing capacity of 1.2 million tonnes per annum (mtpa), operating at water depths between 70 meters to 200 meters deep, PFLNG SATU is expected to lift its first cargo and achieve commercial operations in the first quarter of 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago