Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›VIDEO: Catcher FPSO nears completion
FPSO

May 24, 2017 · about 9 years ago

VIDEO: Catcher FPSO nears completion

Premier Oil has launched a video about the floating production storage and offloading (FPSO) unit for its operated Catcher offshore development in the UK sector of the North Sea. The Catcher, made up of several fields discovered between 2010 and 2013, is located 170 kilometers south-east of Aberdeen

2 minutes read
  • LinkedIn
  • X
  • Email

Premier Oil has launched a video about the floating production storage and offloading (FPSO) unit for its operated Catcher offshore development in the UK sector of the North Sea.

The Catcher, made up of several fields discovered between 2010 and 2013, is located 170 kilometers south-east of Aberdeen. The development entails 22 subsea wells, 14 producers and 8 water injectors, on the Catcher, Varadero and Burgman fields which will be tied back to a leased FPSO.

The FPSO is owned by BW Offshore and leased to Premier for an initial fixed seven-year term and 18 years of options. The unit is currently being built at Keppel’s shipyard in Singapore where a naming ceremony was held in April. The vessel is 241 meters long, 50 meters wide and 27 meters deep.

BW Catcher is scheduled for sailaway from the shipyard in the next few months and is on track to achieve first oil in the fourth quarter of 2017. It will be able to process up to 60,000 barrels of oil a day.

According to an update from Premier in mid-May, the construction work for the installation and integration of the topsides was complete while the construction scope in the hull was nearing completion. In the project update, the oil company was optimistic about plateau output from the field.

Total capex forecast for the project is $1.6 billion, which is 29 percent lower than the sanctioned estimate.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free