Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›VIDEO: Ichthys Venturer FPSO en route to Australia
Infrastructure

July 19, 2017 · about 9 years ago

VIDEO: Ichthys Venturer FPSO en route to Australia

Inpex-operated Ichthys LNG Project’s floating production storage and offloading (FPSO) vessel—Ichthys Venturer—sailed away on July 18 from waters near its construction site in Okpo, South Korea. The FPSO left the shipyard over the weekend to undertake final preparation, commissioning activities and

2 minutes read
  • LinkedIn
  • X
  • Email

Inpex-operated Ichthys LNG Project’s floating production storage and offloading (FPSO) vessel—Ichthys Venturer—sailed away on July 18 from waters near its construction site in Okpo, South Korea.

The FPSO left the shipyard over the weekend to undertake final preparation, commissioning activities and checks prior to sailaway. According to Inpex’s statement on Wednesday, the vessel is now en route to the Ichthys gas-condensate field offshore Western Australia, following the completion of shipyard commissioning and preparation work.

Inpex is currently leading the development of the Ichthys LNG Project as the operator in the Commonwealth of Australia alongside its project partners.

Inpex aslo said that the FPSO will be towed to the Ichthys gas-condensate field approximately 5,600 kilometers distant from Okpo, South Korea over a period of approximately one month, after which it is scheduled to undergo hook-up.

The facility, which is 336 meters long and 59 meters wide, will undertake the role of temporarily storing condensate separated and produced by the Central Processing Facility (CPF) named Ichthys Explorer located offshore approximately 3.5 kilometers away and offloading the condensate to buyers’ tankers, and is a key facility of this project that is expected to be operational for 40 years.

The CPF arrived at the Ichthys gas-condensate field on May 29 of this year following a 34-day towing operation, and having completed mooring , is currently undergoing hook-up and commissioning work.

Most condensate will be transferred from the CPF to the FPSO for offshore processing, with the remainder sent to Darwin with the gas via the project’s 890 kilometer gas export pipeline.

More condensate will be extracted from the gas at the onshore plant in Darwin. Once in the field, the FPSO and CPF will be linked by an electric cable, allowing power supply to flow from each facility as a contingency measure as required.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago