Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›VIDEO: Catcher FPSO on sea trials before sailaway
Infrastructure

August 16, 2017 · about 9 years ago

VIDEO: Catcher FPSO on sea trials before sailaway

BW Offshore-owned floating production storage and offloading (FPSO) vessel BW Catcher, built for Premier Oil-operated Catcher development in the UK sector of the North Sea, is undergoing marine trials in Singapore ahead of its departure to final offshore location. Earlier this week, Premier Oil laun

1 minutes read
  • LinkedIn
  • X
  • Email

BW Offshore-owned floating production storage and offloading (FPSO) vessel BW Catcher, built for Premier Oil-operated Catcher development in the UK sector of the North Sea, is undergoing marine trials in Singapore ahead of its departure to final offshore location.

Earlier this week, Premier Oil launched a video of the FPSO starting its marine trials off Singapore. The unit is scheduled to leave the shipyard and head to the UK this month.

The FPSO was built by Keppel’s shipyard where a naming ceremony was held in April. The vessel is 241 meters long, 50 meters wide and 27 meters deep and it will be able to process up to 60,000 barrels of oil a day.

The Catcher development, made up of several fields discovered between 2010 and 2013, is located 170 kilometers south-east of Aberdeen. The development entails 22 subsea wells, 14 producers and 8 water injectors, on the Catcher, Varadero and Burgman fields which will be tied back to the leased BW Catcher FPSO. Upon completion, the vessel will be on a seven-year fixed term and 18 years of options contract with Premier Oil.

At the end of July Premier Oil was working to complete the last of twelve wells scheduled for completion pre-first oil and the project remains on track for start-up in 2017.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago