Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Catcher FPSO heads to North Sea
Infrastructure

August 28, 2017 · about 9 years ago

Catcher FPSO heads to North Sea

BW Offshore-owned FPSO BW Catcher has left Keppel Shipyard in Singapore and is currently in transit to the Premier Oil-operated Catcher field in the UK sector of the North Sea. The FPSO was built by Keppel Shipyard where a naming ceremony was held in April. Before it headed to its final offshore loc

2 minutes read
  • LinkedIn
  • X
  • Email

BW Offshore-owned FPSO BW Catcher has left Keppel Shipyard in Singapore and is currently in transit to the Premier Oil-operated Catcher field in the UK sector of the North Sea.

The FPSO was built by Keppel Shipyard where a naming ceremony was held in April. Before it headed to its final offshore location, the vessel recently completed sea trials .

BW Catcher is expected to reach UK waters early in the fourth quarter, depending on prevailing weather conditions, BW Offshore informed over the weekend.

Upon its arrival, BW Catcher will start a seven-year fixed term contract, with extension options of up to 18 years, with Premier Oil. Based on a field life of 10 years, the contract value for BW Offshore is $2.3 billion, including FPSO charter rate and opex.

“The BW Catcher has been completed on time and within budget, and we are especially pleased with the good HSE performance during the construction project. We have worked over 11 million man hours without a lost time injury and in total around 19 million man hours. The FPSO is now underway to the North Sea for hook-up at the Catcher field, and with first oil scheduled later this year,” said Carl K. Arnet , the CEO of BW Offshore.

BW Catcher is 241 meters long, 50 meters wide, and 27 meters deep. It has an oil storage capacity of 650,000 barrels and a processing capacity of 60,000 barrels per day. The FPSO has a design life of 20 years of uninterrupted operations, and will be moored using a submerged turret production system.

The Premier-operated Catcher development, made up of several fields discovered between 2010 and 2013, is located 170 kilometers south-east of Aberdeen. The development entails 22 subsea wells, 14 producers and 8 water injectors, on the Catcher, Varadero and Burgman fields, which will be tied back to the Catcher FPSO.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

10 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

10 days ago