Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Keppel delivers FPSO for Petrobras’ Tartaruga fields
Infrastructure

September 29, 2017 · about 8 years ago

Keppel delivers FPSO for Petrobras’ Tartaruga fields

Keppel FELS Brasil’s BrasFELS shipyard has handed over the Cidade de Campos dos Goytacazes MV29 FPSO to MODEC. The floating production storage and offloading unit left the shipyard recently for the Bananal Bay in Brazil. It will subsequently be deployed in the Petrobras-run Tartaruga Verde and Tarta

2 minutes read
  • LinkedIn
  • X
  • Email

Keppel FELS Brasil’s BrasFELS shipyard has handed over the Cidade de Campos dos Goytacazes MV29 FPSO to MODEC.

The floating production storage and offloading unit left the shipyard recently for the Bananal Bay in Brazil.

It will subsequently be deployed in the Petrobras-run Tartaruga Verde and Tartaruga Mestiça Fields, in the Campos Basin, located about 112 kilometers offshore Macaé, in the State of Rio de Janeiro, Brazil.

Kwok Kai Choong , CEO and President of Keppel FELS Brasil, said, “This is BrasFELS’ fifth successful collaboration with our long-standing customer MODEC and we are proud to again deliver to their satisfaction. We would like to express our appreciation to MODEC for their trust and confidence in our commitment and capabilities as well as for the strong teamwork throughout the duration of the project. This is also BrasFELS’ 9th FPSO project for Brazil and it demonstrates our commitment and reliability in supporting the country’s oil and gas industry.”

BrasFELS’ workscope for the FPSO Cidade de Campos dos Goytacazes MV29 included the fabrication of nine topside production modules as well as integration works.

The FPSO has a production capacity of 150,000 barrels of oil per day (bopd) and 5 million cubic metres of gas per day, and a storage capacity of 1.6 million barrels of oil.

Sateesh Dev , President & CEO of MODEC Offshore Production Systems (Singapore), said, “The FPSO Cidade de Campos dos Goytacazes MV29 project bears testament to MODEC’s and BrasFELS’ shared commitment for safe, on time and high quality execution. Over the years, we have chosen BrasFELS as our choice shipyard in Brazil because of their reliability, cost-efficiency and capability to meet our needs. MODEC is steadfast in supporting the development and growth of Brazil’s significant oil and gas industry, and we are glad to have a good partner in the Keppel Group to support us on this journey.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Infrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

12 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

12 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

12 days ago