Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Conversion phase for Exxon’s Liza FPSO kicks off with tanker arrival
Infrastructure

November 14, 2017 · about 8 years ago

Conversion phase for Exxon’s Liza FPSO kicks off with tanker arrival

The Bahamas-flagged very large crude carrier (VLCC) Tina has arrived at Keppel Shipyard where it will be converted into an FPSO unit for SBM Offshore and then used to develop ExxonMobil’s Liza field offshore Guyana.

2 minutes read
  • LinkedIn
  • X
  • Email

The Bahamas-flagged very large crude carrier (VLCC) Tina has arrived at Singapore’s Keppel Shipyard where it will be converted into an FPSO unit for SBM Offshore and then used to develop ExxonMobil’s Liza field offshore Guyana.

Following SBM Offshore’s completion of the Front End Engineering and Design (FEED) and a final investment decision on the Liza Phase 1 Development project by ExxonMobil in June 2017, SBM on Tuesday announced the next step in its scope for the floating production, storage and offloading vessel (FPSO).

The arrival of the tanker, ultimately destined for the Liza Phase 1 project in Guyana, marks the start of the FPSO conversion phase, SBM Offshore said.

Keppel secured a contract for the conversion of a VLCC into an FPSO, which will be deployed to the Liza field, back in October. As recently reported by Offshore Energy Today, Keppel’s work scope, which was planned to start by the end of this year, includes refurbishment and life extension works, such as the upgrading of living quarters, fabrication and installation of spread mooring systems, as well as the installation and integration of topside modules.

Bernard van Leggelo , SBM Offshore FPSO Managing Director, said: “With the arrival of the tanker we now begin in earnest the construction phase of the journey that SBM Offshore is on. We will leverage our in-depth experience with over 34 FPSO projects to date. Our objective is to safely deliver the Liza FPSO in partnership with our client and the experienced team at Keppel by working together as one team. SBM is proud to play its part for this major project by laying the foundation for the first FPSO for our client’s offshore development in Guyana.”

The FPSO is designed to produce up to 120,000 barrels of oil per day, will have associated gas treatment capacity of circa 170 million cubic feet per day and water injection capacity of circa 200,000 barrels per day. The converted VLCC FPSO will be spread moored in water depth of 1,525 meters and will be able to store 1.6 million barrels of crude oil.

The Liza field is located in the Stabroek block, which covers almost 27,000 square kilometers, circa 200 kilometers offshore Guyana. Esso Exploration and Production Guyana Limited is the operator and holds a 45 percent interest in the Stabroek block. Hess Guyana Exploration Ltd. holds a 30 percent interest, and CNOOC Nexen Petroleum Guyana Limited holds a 25 percent interest.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago