Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Petrobras: Pre-salt output falls over FPSO shutdowns
Infrastructure

November 15, 2017 · about 8 years ago

Petrobras: Pre-salt output falls over FPSO shutdowns

Petrobras produced less oil and natural gas from the pre-salt layer in October than it did during September due to maintenance shutdowns on two FPSOs.

2 minutes read
  • LinkedIn
  • X
  • Email

Brazilian oil company Petrobras produced less oil and natural gas from the pre-salt layer in October than it did during September due to maintenance shutdowns on two FPSOs.

The oil company reported on Tuesday that its total oil and natural gas production in October was 2.77 million barrels of oil equivalent per day (boed), with 2.67 million boed produced in Brazil and 104 thousand boed produced abroad.

The average oil production in the country was 2.16 million barrels per day (bpd), in line with the volume produced in September.

The natural gas production in Brazil, excluding the liquefied volume, was 80.3 million m³/d, 1.5% lower than the previous month. This result was mainly due to the maintenance stoppages of FPSO Cidade de Anchieta, which operates in the Jubarte, Baleia Azul and Pirambu fields, in Campos Basin pre-salt, and FPSO Cidade de Caraguatatuba, which operates in the Lapa field, in Santos Basin pre-salt.

Pre-salt production

In October, the oil and natural gas production operated by Petrobras (wholly-owned and partner shares) in the pre-salt layer was 1.63 million boed, 2.9% lower than the previous month. This result was also due to the maintenance stoppages of FPSOs Cidade de Anchieta and Cidade de Caraguatatuba.

Oil and gas production abroad

In October, oil production in overseas fields was 61 thousand bpd, 3.6% lower than the volume produced in the previous month. This decrease was mainly due to operational occurrences in Akpo and Agbami producing fields in Nigeria and wells shutdown in the United States during the passage of the Hurricane Nate.

The natural gas production was 7.3 million m³/d, stable in relation to the volume produced in September 2017.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Infrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

12 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

12 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago