Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Premier lifts first cargo of Catcher oil
FPSO

January 24, 2018 · about 8 years ago

Premier lifts first cargo of Catcher oil

Premier Oil has lifted the first export cargo of oil of approximately 500,000 barrels from its Catcher development set in the UK sector of the North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

UK-based independent Premier Oil has lifted the first export cargo of oil of approximately 500,000 barrels from its Catcher development set in the UK sector of the North Sea.

The development was brought on stream on December 23, 2017, and the first cargo was lifted on Tuesday, January 23. Premier said it had been sold at a premium to Brent.

The second cargo, which is scheduled for the third week of February, has also been sold at a similar premium to Brent.

To date, four production wells – two from the Catcher field and two from the Varadero field – have been brought online. Initial rates from these four producers totaled in excess of 60 kbopd and, as planned, these wells are being deliberately constrained at an average of 20 kbopd whilst final commissioning of the gas processing modules on the FPSO is completed.

According to the company, performance of the BW Catcher FPSO has been excellent with high operational uptime. Commissioning of the water injection system has been completed. Gas commissioning is progressing well with the gas import/export pipeline now fully open to the SEGAL pipeline and booster compression test runs successfully concluded.

The next stages of gas treatment and export compression commissioning will now follow with the switch to fuel gas for the main power generation and ancillary boilers set to start this week. Once the gas systems, including gas export, are fully available, production will be brought on-stream from the Burgman field and full production from the Catcher Area is planned to increase to 60 kbopd . This remains on schedule for 2Q 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free