Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›PHOTO: Aker Solutions gears up for Johan Castberg work
FPSO

March 5, 2018 · about 8 years ago

PHOTO: Aker Solutions gears up for Johan Castberg work

Norwegian oil services company Aker Solutions is preparing to start building components for the Statoil-operated Johan Castberg development located in the Barents Sea offshore Norway.

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian oil services company Aker Solutions is preparing to start building components for the Statoil-operated Johan Castberg development located in the Barents Sea offshore Norway.

In an update on its social media channels on Monday, Aker Solutions said that its yard in Sandnessjøen, Norway is gearing up to start building ten subsea templates for Johan Castberg and two topside modules for the FPSO.

“We look forward to working closely with Statoil on this exciting project,” says Annbjørg Skjerve , the site manager at Sandnessjøen.

Aker Solutions was awarded a contract by Statoil to supply the subsea production system and design the topside of the FPSO facility for the Johan Castberg development in December 2017 . The total value of the work for Aker Solutions is about NOK 4 billion (about $510 million at current exchange rates).

The subsea production system will consist of 30 wells with vertical subsea trees, wellheads, control systems, 10 templates and manifolds, two satellite structures and tooling.

The FPSO agreement covers engineering, procurement and management assistance for the detailed design of the Johan Castberg topside.

Also in December, Aker Solutions received a contract from Sembcorp Marine, which is in charge of the construction of the hull and integrated living quarters for the Johan Castberg FPSO, to design the living quarters for the development’s FPSO.

In addition, Aker Solutions was in February 2018 subcontracted by Kvaerner to deliver the topside modules. Aker Solutions’ yard in Egersund will deliver the modules for water and chemical injection, while the company’s facility in Sandnessjøen will deliver smaller modules and the flare boom.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOEquipmentInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free