Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›QGEP starts production from Atlanta field offshore Brazil
Infrastructure

May 3, 2018 · about 8 years ago

QGEP starts production from Atlanta field offshore Brazil

Brazilian independent oil company QGEP has started oil production from its Atlanta offshore field using the early production system in the form of Petrojalr 1 FPSO

2 minutes read
  • LinkedIn
  • X
  • Email

Brazilian independent oil company QGEP has started oil production from its Atlanta offshore field using the early production system in the form of Petrojalr 1 FPSO.

QGEP on Thursday informed that the first oil from the field located in Brazil’s Santos Basin started flowing on May 2, from one well.

“The well 7-ATL-2HP-RJS is still in the stabilization phase and the Field is expected to reach daily production of 20,000 barrels of oil later in the second quarter of this year, from two wells,” QGEP said.

The oil will be sold to Shell, who has contracted to purchase all of the production from the Atlanta Field’s Early Production System (EPS).

Lincoln R. Guardado, QGEP’s Chief Executive Officer, said, “We are pleased to announce the beginning of production in Atlanta, a Field which we have been successfully overcoming technical challenges. This represents QGEP’s second producing asset and will be a positive contributor to our operating cash flow. This project has a special meaning for us. We are the first Brazilian independent oil and gas company operating in ultra-deep waters, thus proving our technical and operational capability.”

Danilo Oliveira, QGEP’s Production Director, added: “Later this year, the consortium will decide whether to drill a third well as part of the EPS, which could add 10,000 barrels per day (kbpd) to production. This phase will be important to the longer term objective of establishing the Full Development System in Atlanta, where we expect a maximum production of about 75 kbpd until 2021.”

Located in Block BS-4, in the Santos Basin, Atlanta is a post-salt oil field situated 185 kilometers from the city of Rio de Janeiro, in water depths of approximately 1,500 meters.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago