Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›TechnipFMC & Samsung JV, Modec competing for Barossa FPSO design
FPSO

June 18, 2018 · about 8 years ago

TechnipFMC & Samsung JV, Modec competing for Barossa FPSO design

ConocoPhillips has awarded three major engineering projects as part of the front end engineering and design (FEED) phase of the Barossa offshore project in W. Australia.

2 minutes read
  • LinkedIn
  • X
  • Email

ConocoPhillips has awarded three major engineering projects as part of the front end engineering and design (FEED) phase of the Barossa offshore project in W. Australia.

As previously reported, the Barossa development concept includes a floating production storage and offloading facility (FPSO), six subsea production wells to be drilled in the initial phase, subsea production system, supporting in-field subsea infrastructure and a gas pipeline to Darwin, all located in Australian Commonwealth waters.

ConocoPhillips’ partner in the project Santos on Monday said that separate engineering contracts for the FPSO were awarded to MODEC and a consortium between TechnipFMC and Samsung Heavy Industries. A design competition will be conducted between the two groups.

A third contract, for the subsea infrastructure including umbilicals, flowlines, risers, and gas export pipeline, has been awarded to INTECSEA.

Santos Managing Director and Chief Executive Officer, Kevin Gallagher said: “These contracts reaffirm Barossa’s position as the leading candidate for Darwin LNG backfill, with no alternative projects in the FEED phase. Barossa would more than double Santos’ production in northern Australia and significantly increase our portfolio LNG production from early 2024 when strong, unfulfilled LNG demand is expected.”

“The award of the FEED contracts is another big step towards ensuring Barossa replaces Bayu-Undan production when it ceases in the early 2020s.”

Gallagher said: “An FPSO design competition between leading engineering contractors with experience in the Australian market will ensure a robust, cost competitive package is delivered ahead of a final investment decision.”

“Other FEED works are also moving ahead with geotechnical and geophysical surveys of the pipeline route and subsea manifold locations currently underway in the field,” he added.

A final investment decision is targeted towards the end of 2019 for the field located 300 kilometers north of Darwin.

Santos holds a 25% interest in the Barossa-Caldita joint venture along with partners ConocoPhillips (37.5% and operator) and SK E&S (37.5%). Santos is also a joint venture partner in Darwin LNG with an 11.5% interest.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free