Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Petrobras kicks off oil production from Tartaruga Verde offshore field
Infrastructure

June 26, 2018 · about 8 years ago

Petrobras kicks off oil production from Tartaruga Verde offshore field

Brazil’s Petrobras has kicked off oil production from its Tartaruga Verde (Green Turtle) field in deep water of Campos basin, offshore Brazil.

2 minutes read
  • LinkedIn
  • X
  • Email

Brazil’s Petrobras has kicked off oil production from its Tartaruga Verde (Green Turtle) field in the Campos basin, offshore Brazil.

The oil company said the production started on Friday, June 22, 2018, via the FPSO Cidade de Campos dos Goytacazes.

The FPSO is located about 127 km off the coast of the state of Rio de Janeiro, in water depth of 765 meters, with a capacity to process daily up to 150 thousand barrels of oil and 3.5 million cubic meters of gas and 5 million cubic meters of gas compression.

Tartaruga Verde field has good quality oil (27º API) and is located in the southern area of Campos Basin, in the post-salt, in water depth ranging from 700 to 1,300 meters and with reservoirs at 3,000 meters depth.

It consists of two reservoirs, Tartaruga Verde, where Petrobras holds 100% interest, and Tartaruga Mestiça, a joint reservoir between the Union, represented by Pre-Sal Petróleo SA – ‘PPSA’, with a 30.65% interest, and Petrobras with 69.35%. All of the field production will be offloaded by FPSO Cidade de Campos dos Goytacazes.

This is the second platform to start operations this year and will contribute to the increase of Petrobras’ production under the 2018-2022 Business and Management Plan, the company said.

The FPSO is owned by Japanese Modec, who said that the first oil marks the start of the unit’s 20-year time charter contract with Petrobras.

Moored approximately 125 kilometers from Macaé, State of Rio de Janeiro in the southeast coast of Brazil, in water depths of 765 meters, the FPSO is capable of processing 150,000 barrels of crude oil per day, 176 million standard cubic feet of gas compression per day and has a storage capacity of 1,600,000 barrels of crude oil.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Infrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

13 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

13 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago