Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MODEC confirms FEED work on Barossa FPSO
Business & Finance

July 3, 2018 · about 8 years ago

MODEC confirms FEED work on Barossa FPSO

Japan’s MODEC has confirmed the award of a contract by ConocoPhillips for the front end engineering design (FEED) of a floating production storage and offloading (FPSO) vessel for Barossa project located offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email

Japan’s MODEC has confirmed the award of a contract by ConocoPhillips for the front end engineering design (FEED) of a floating production storage and offloading (FPSO) vessel for Barossa project located offshore Australia.

ConocoPhillips is the operator of the Barossa joint venture with a 37.5% interest. Its partners are SK E&S Australia (37.5%) and Santos Offshore (25%).

The joint venture entered the FEED phase for the development of the Barossa gas field to backfill Darwin LNG (DLNG) in April 2018.

FEED activities involve engineering and commercial work aimed at finalization of the project’s technical detail, costs, LNG sales agreements and negotiation of access arrangements with the owners of DLNG and the Bayu-Undan to Darwin gas pipeline. A final investment decision (FID) is targeted towards the end of 2019, with first gas expected in 2023.

ConocoPhillips then in June awarded major engineering projects as part of the FEED phase of the Barossa offshore project to MODEC and a consortium between TechnipFMC and Samsung Heavy Industries, as part of a design competition. A third contract, for the subsea infrastructure including umbilicals, flowlines, risers, and gas export pipeline, was awarded to INTECSEA.

MODEC said on Tuesday that, under the contract, it will participate in the FEED on a competitive basis against a JV of two other contractors.

Barossa is an offshore gas and light condensate project that proposes to provide a new source of gas to the existing Darwin LNG facility. The offshore development concept includes subsea production system and gas export pipeline as well as the FPSO, located approximately 300 kilometers north of Darwin, Australia.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceInfrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago