Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Premier to sanction Catcher tie-backs in 1Q 2019
Infrastructure

August 23, 2018 · about 8 years ago

Premier to sanction Catcher tie-backs in 1Q 2019

UK-based Premier Oil has found several tie-back options for its Catcher development in the UK North Sea, with an aim to sanction the project during the first quarter of 2019. The Catcher Area, which started oil production in December 2017 through the BW Offshore-owned Catcher FPSO, reached contracte

2 minutes read
  • LinkedIn
  • X
  • Email

UK-based Premier Oil has found several tie-back options for its Catcher development in the UK North Sea, with an aim to sanction the project during the first quarter of 2019.

The Catcher Area, which started oil production in December 2017 through the BW Offshore-owned Catcher FPSO, reached contracted plateau production rates of 60 kbopd (gross) in May with day rates of up to 70 kboepd (gross) having been achieved after the first half of the year.

As delivery potential from the available wells remains significantly in excess of the FPSO design capacity, preliminary discussions have started with the FPSO provider BW Offshore about sustaining production rates above the currently contracted 60 kbopd (gross).

The completion of of the current phase of the Catcher Area development is expected by November following completion of the 17th and 18th producer well.

As the next step, the company said on Thursday it has identified several near field discoveries as potential high value subsea tie-backs to the Catcher Area FPSO to maintain and extend plateau production.

In particular, the development concepts for the Laverda and Catcher North oil accumulations have been selected and will comprise two development wells drilled from a common drill centre tied back to the Varadero manifold. Project sanction is targeted for the first quarter of 2019.

In addition, Premier has identified potential infill well locations targeting resources beyond the reach of the initial production wells. Premier also plans to acquire 4D seismic to help define future infill drilling locations.

In February, Premier was awarded two blocks adjacent to the Catcher Area in the UK 30th Offshore Licensing Round. One of the blocks lies to the south of the Catcher field and contains the Bonneville discovery, a potential future tie-back to the Catcher Area infrastructure.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago