Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tullow hires Subsea 7 for Jubilee work
Business & Finance

October 10, 2018 · about 7 years ago

Tullow hires Subsea 7 for Jubilee work

Subsea 7 has been awarded a contract by Tullow on the Jubilee field, offshore Ghana, in water depths of up to 1000 meters.

2 minutes read
  • LinkedIn
  • X
  • Email

UK subsea engineering, construction, and services company Subsea 7 has been awarded a contract by Tullow on the Jubilee field, offshore Ghana, in water depths of up to 1000 meters.

Subsea 7 said on Wednesday that the engineering, procurement, construction and installation (EPCI) contract is awarded under a consortium comprising Subsea 7 Volta Contractors and NOV Oil & Gas Services Ghana Ltd. This award is a sizeable contract for Subsea 7, meaning it is worth between $50 million and $150 million.

Subsea 7’s scope of work includes the installation of the Buoy Turret Loading (BTL) system from APL, a group within NOV Completion & Production Solutions, with associated suction piles and EPCI activities including two offloading lines for the BTL and the additional hang-off platform and skid for the FPSO. A significant part of the fabrication will be completed locally, in Ghana, and the offshore installation will take place in 2020, the company said.

Gilles Lafaye , Subsea 7’s Vice President Africa Region, said: “This award reflects our early engagement in design and engineering and the consortium’s experience in comparable projects within the region. This project builds upon our presence in the Ghanaian market and our long-term relationship with Tullow.”

Jubilee

The Jubilee field was discovered in 2007 by the Mahogany-1 (M-1) and Hyedua-1 (H-1) exploration wells, which were drilled some 5 km apart and intersected large continuous accumulations of light sweet crude oil. The M-1 and H-1 wells discovered large net pays of 95m and 41m respectively in high-quality stacked reservoir sands.

In July 2009, the Minister of Energy approved the Phase 1 Plan of Development which included the use of an FPSO with a facility capacity of 120,000 bopd. In December 2010, the field came on-stream.

An issue with the turret bearing of the Jubilee FPSO Kwame Nkrumah was identified in February 2016. In June 2016, Tullow and its partners established that the long-term solution was to convert the FPSO to a permanently spread moored facility. The FPSO was spread-moored on its current heading in February 2017.

The next phase of the project to stabilize the turret bearing was completed in the first half of 2018 and the final task to rotate the FPSO to its permanent heading and to carry out the final spread-mooring will take place around the end of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceInfrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago