Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Petrobras brings online second FPSO in Búzios field
Infrastructure

November 13, 2018 · about 7 years ago

Petrobras brings online second FPSO in Búzios field

Petrobras has started the production of oil and natural gas in the Búzios 2 area, in the pre-salt of Santos Basin, by means of P-75 FPSO, which is the second unit installed in the Búzios field.

1 minutes read
  • LinkedIn
  • X
  • Email

Brazilian oil company Petrobras has started the production of oil and natural gas in the Búzios 2 area, in the pre-salt of Santos Basin, by means of P-75 FPSO, which is the second unit installed in the Búzios field off Brazil.

The floating production, storage, and offloading unit of oil and gas (FPSO) is located approximately 210 km off the coast of the state of Rio de Janeiro, at a water depth of 2,000 meters.

Petrobras said on Monday that, with a daily capacity to process up to 150,000 barrels of oil and compress up to 6 million cubic meters of natural gas, P-75 would produce through ten producing wells, also using seven injection wells. Relief vessels will be used to offload the oil production, while gas will be drained by pre-salt pipeline routes.

According to the oil company, the P-75 is the fourth platform to start production in 2018, after the FPSO Cidade Campos dos Goytacazes in the Tartaruga Verde field, the P-69 in the Lula field and the P-74 in the Búzios field.

These platforms, together with P-67, which is already located in the Lula field, and P-76, which should go to the Búzios field in December, will conclude the six systems planned for this year in Brazil, contributing to the increase of Petrobras’ production in the horizon of the 2018-2022 Business and Management Plan.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Infrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago

‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

13 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago
‘UK’s largest-ever’ electricity transmission project in major construction phase
Business & Finance

‘UK’s largest-ever’ electricity transmission project in major construction phase

13 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago