Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›BW offloads first oil cargo from Tortue field FPSO
Infrastructure

December 3, 2018 · about 7 years ago

BW offloads first oil cargo from Tortue field FPSO

First oil cargo was offloaded from the BW Offshore-owned FPSO BW Adolo on Sunday, December 2.

2 minutes read
  • LinkedIn
  • X
  • Email

First oil cargo was offloaded from the BW Offshore-owned FPSO BW Adolo located offshore Gabon on Sunday, December 2.

A total of 550,000 bbls of oil were transferred from the FPSO to a tanker which will transport the crude oil to a refinery, BW Offshore said on Monday.

The BW Adolo FPSO is installed on the Tortue field, one of five proven discoveries in the Dussafu license.

The field development and start of production on the Dussafu license has progressed within budget and on schedule, BW added.

The FPSO unit was prepared for deployment at Tortue by a Keppel shipyard in Singapore and officially named FPSO BW Adolo in early April 2018. It arrived in Gabon in late July and hook up of mooring systems and installation of risers and umbilicals were completed in September.

After completing the hook up and installation, the BW Adolo achieved first oil from the Tortue field on September 16.

The Dussafu license is operated by BW Energy Gabon (BWEG), which holds a 91.667 percent interest, while Panoro holds an 8.333 percent interest as a partner. BW Energy is a subsidiary of BW Offshore.

The BW Adolo is a converted VLCC with an oil storage capacity of up to 1,350,000 barrels and a production capacity of up to 40,000 barrels oil per day. The vessel has undergone an increased life extension scope enabling an extended production profile on the back of positive reserve developments.

It is also worth mentioning that BW in late November sanctioned the second phase of its Tortue development . The second phase entails drilling of four additional horizontal development wells, tied back to the FPSO with a budget of $275 million.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

11 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

11 days ago