Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Brazilian shipyard to build modules for Mero FPSO
Business & Finance

January 28, 2019 · about 7 years ago

Brazilian shipyard to build modules for Mero FPSO

The Estaleiros do Brasil Ltda. (EBR), has been selected by Japan’s MODEC for the fabrication and assembly of a number of topsides process modules for an FPSO system, the FPSO Guanabara MV31.

2 minutes read
  • LinkedIn
  • X
  • Email

Brazil’s offshore construction specialist, the Estaleiros do Brasil Ltda. (EBR), has been selected by Japan’s MODEC for the fabrication and assembly of a number of topsides process modules for a floating, production, storage & offloading (FPSO) system, the FPSO Guanabara MV31.

EBR said that the scope of work to be carried out at the EBR shipyard, located in the city of São José do Norte, Rio Grande do Sul, Brazil, includes the fabrication and assembly of modules which comprise the topsides water treatment system for the FPSO unit.

The project will start in the first quarter of 2019 with a twelve-month delivery schedule, the company added.

The FPSO Guanabara MV31, currently being built by MODEC , will be contracted by Petrobras through a lease and operate contract for the Mero field, where the FPSO unit will be installed. The FPSO is planned to be deployed at the Mero field in 2021 and the charter is for 22 years.

The Mero field is located about 180 kilometers off the coast of Rio de Janeiro, Brazil at a water depth approximately 2,100 meters. It is currently being developed by the Libra Consortium, composed of Petrobras (operator), Shell, Total, CNPC & CNOOC. The Libra Production Sharing Contract is managed by Pré-Sal Petróleo S.A. (PPSA).

According to EBR, when complete, the FPSO Guanabara MV31 will have a processing capacity of up to 180,000 barrels of oil per day and 12 million cubic meters of gas per day.

Sateesh Dev , President & CEO of MODEC Offshore Production Systems, said: “After a detailed request for proposal & clarification process, MODEC is pleased to have selected EBR for this scope of work on the first FPSO unit being delivered to Petrobras & the Libra Consortium for the pre-salt Mero field in the Santos Basin.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentInfrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago