Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Contract for SNE field FPSO goes to MODEC
Business & Finance

February 25, 2019 · about 7 years ago

Contract for SNE field FPSO goes to MODEC

Australia’s Woodside has awarded the front-end engineering design (FEED) contract for the SNE field development FPSO to Japan’s MODEC.

2 minutes read
  • LinkedIn
  • X
  • Email

Australia’s Woodside has awarded the front-end engineering design (FEED) contract for the SNE field development Phase 1 floating production storage and offloading (FPSO) vessel to Japan’s MODEC.

Woodside is the operator of the Rufisque Offshore, Sangomar Offshore and Sangomar Deep Offshore (RSSD) joint venture, which contains the SNE field.

MODEC said on Monday that, under the contract and subject to a final investment decision on the project in 2019, it will be responsible for the supply, charter and operations of the FPSO.

The SNE deep-water oil field is expected to be Senegal’s first offshore oil development.

According to MODEC, the FPSO will be designed to produce around 100,000 barrels of crude oil per day, with the first oil production targeted in 2022. The FPSO will be moored in water depth of approximately 800 meters.

Woodside CEO, Peter Coleman, said: “Securing an FPSO facility is a significant step for the joint venture and will allow the project team to complete the technical and commercial activities required to support a final investment decision, targeted for mid-2019.”

FAR, Woodside’s partner in the project, said on Monday that the FPSO will be designed to allow for the integration of subsequent SNE development phases, including gas export to shore and future subsea tie-backs from other reservoirs and fields. Phase 1 of the development will target an estimated 230 mmbbl of oil resources (P50 gross) from 11 producing wells, 10 water injectors and 2 gas injectors.

FAR’s Managing Director Cath Norman said, “This is another milestone reached for the SNE development and for the RSSD joint venture towards reaching a Final Investment Decision (FID) targeted for 2019.”

Woodside has previously awarded the subsea FEED contract for the SNE Field Development-Phase 1 to Subsea Integration Alliance, a partnership between Schlumberger and Subsea 7.

The SNE field is held by Woodside Energy (Senegal) B.V. (35%) as operator, Cairn Energy Senegal (40%), FAR Limited (15%) and PETROSEN (10%) under a Production Sharing Contract (PSC).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceInfrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

11 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

11 days ago