Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›‘Helix Producer-1’ to resume production ‘in the coming days’
FPSO

March 14, 2019 · about 7 years ago

‘Helix Producer-1’ to resume production ‘in the coming days’

The U.S. oil operator Talos Energy is set to resume production from its Gulf of Mexico fields Phoenix and Tornado, following the completion of a mandatory dry-dock of the Helix Producer-1 vessel.

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. oil operator Talos Energy is set to resume production from its Gulf of Mexico fields Phoenix and Tornado, following the completion of a mandatory dry-dock of the Helix Producer-1 vessel.

The vessel had moved to dry dock as regulations require that the Helix Producer-1 must go into dry dock twice during every five year period with an average non‐productive period of 45 – 60 days each time. This has now been completed.

In an operational update on Wednesday, Talos’ CEO Timothy Duncan said:”[The Helix Producer-1 ] dry-dock project in the first quarter of 2019 was flawlessly executed by the Talos team and our partner Helix Energy Solutions, and we expect the production in the Phoenix complex to be restarted in the coming days. ”

He said Talos would now work to tie its Tornado 3 and Boris 3 wells to the Helix Producer 1 once the wells are completed.

“Soon thereafter we expect to bring the impactful Tornado 3 and Boris 3 wells online, which will put Talos in a position to grow production year over year while continuing to generate free cash flow in the current price environment for 2019,” Duncan said.

As said earlier, Talos had moved the production vessel to dry-dock where it got the thrusters replacement, and undergo maintenance to the top-sides and hull.

Prior to the drydocking, the Phoenix complex produced approximately 35 MBoe/d total gross, of which approximately 25 MBoe/d is produced from two Tornado wells.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free