Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›TechnipFMC to deliver subsea production system for ConocoPhillips’ Barossa project
Infrastructure

May 9, 2019 · about 7 years ago

TechnipFMC to deliver subsea production system for ConocoPhillips’ Barossa project

ConocoPhillips has hired TechnipFMC for the supply of Subsea Production System (SPS) for its Barossa offshore gas and condensate project offshore Australia. TechnipFMC’s subsidiary Technip Oceania will be delivering the system and the associated SPS installation support for the project located 300 k

3 minutes read
  • LinkedIn
  • X
  • Email

ConocoPhillips has hired TechnipFMC for the supply of Subsea Production System (SPS) for its Barossa offshore gas and condensate project offshore Australia.

TechnipFMC’s subsidiary Technip Oceania will be delivering the system and the associated SPS installation support for the project located 300 kilometers north of Darwin. In a separate statement, ConocoPhillips’ partner in the project Santos said the TechnipFMC contract included the engineering, design and fabrication of wellheads, manifolds and control system as well as installation and commissioning assistance.

The Barossa offshore gas and light condensate project is currently in the front-end engineering design (FEED) phase. Subject to commercial arrangements being agreed, Barossa will provide a new source of gas to the existing Darwin LNG facility when the current offshore gas supply from Bayu-Undan is exhausted, ConocoPhillips has said.

Barossa’s offshore development concept includes a and FPSO, SPS and gas export pipeline. Award of the SPS EPC contract to TechnipFMC comes following earlier awards in June 2018 of Barossa FEED engineering design contracts for the FPSO to MODEC , and subsea infrastructure and gas export pipeline.

Commenting on the SPS contract, ConocoPhillips Australia West President Chris Wilson said the award was “another significant step in positioning Barossa as a leading candidate to extend the life of the Darwin LNG facility for another two decades.”

“This award represents a significant milestone in the Barossa Project. The SPS facilities include critical, long lead time equipment which is required to be ordered prior to a final investment decision in order to meet the project schedule,” Mr. Wilson said.

“We continue to focus on strong cost discipline with all our selected contractors, developing the certainty of cost, schedule and execution planning required to compete in our global portfolio and support a final investment decision.”

FID in early 2020

Santos Managing Director and Chief Executive Officer Kevin Gallagher said: “This is the first EPC contract to be awarded for Barossa and a big vote of confidence in its position as the leading project to backfill DLNG. We’re making good progress in the front-end engineering and design (FEED) phase including the evaluation of bids for the gas export pipeline.”

He added: “We are also looking at technical proposals for the floating production storage and offloading facility from both MODEC and the Technip/Samsung Heavy Industries consortium. An invitation to tender for the development drilling contract has also been released, further advancing the project to meet DLNG’s backfill timetable.”

“Barossa’s successful development will more than double Santos’ Northern Australia production based on our higher equity position in the project,” Gallagher said.

Santos, which holds a 25 percent stake in the project, said the partnership was targeting FID in early 2020.

Offshore Energy Today Staff

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Offshore Energy Today, established in 2010, is read by over 10,000 industry professionals daily. We had nearly 9 million page views in 2018, with 2.4 million new users. This makes us one of the world’s most attractive online platforms in the space of offshore oil and gas and allows our partners to get maximum exposure for their online campaigns.

If you’re interested in showcasing your company, product or technology on Offshore Energy Today contact our marketing manager Mirza Duran for advertising options.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Infrastructure

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

14 days ago