Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Petronas kicks off first production from FLNG Satu after recent location change
Infrastructure

May 21, 2019 · about 7 years ago

Petronas kicks off first production from FLNG Satu after recent location change

Petronas has recently achieved its first liquefied natural gas (LNG) drop by its floating LNG facility, Petronas Floating LNG Satu (PFLNG Satu) at the Kebabangan cluster field, 90 kilometers offshore Sabah.

2 minutes read
  • LinkedIn
  • X
  • Email

Malaysia’s Petronas has recently achieved its first liquefied natural gas (LNG) drop by its floating LNG facility Petronas Floating LNG Satu (PFLNG Satu) at the Kebabangan cluster field, 90 kilometres offshore Sabah.

Operated by Kebabangan Petroleum Operating Company Sdn Bhd (KPOC), Kebabangan field is the second location for PFLNG Satu after its successful operation in Kanowit field, Sarawak. Namely, the FLNG unit was moved from the Kanowit field to Kebabangan cluster earlier this year.

SOFEC, a MODEC Group company, was in charge of the engineering, supply, and delivery of a mooring system – chains & anchors – for the Petronas’ FLNG Satu external turret.

In a statement on Tuesday, May 21 Petronas said that the introduction of first gas into the PFLNG Satu – done on May 4, 2019 – was achieved from Kebabangan field to the PFLNG Satu’s turret system via a 5-km flexible pipeline.

The beginning of a series of start-up activities included the cooling down of natural gas until the production of the first LNG drop on May 7, 2019, just three days after.

Petronas Vice President of LNG Asset, Zakaria Kasah , said: “We not only prove our concept of relocatable floating LNG facility, but we have also seamlessly achieved the first LNG drop in just 3 days after first gas in. This is indeed another proud moment and a great milestone for Petronas and the floating LNG industry.”

Designed for water-depth of between 70 meters and 200 meters and a processing capacity of 1.2 million tonnes per annum (MTPA) with 155 crew onboard, PFLNG Satu will support Petronas’ global LNG portfolio. The first LNG cargo delivery at the new field is expected in June 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago