Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›Regulator accepts Woodside’s Wanaea well intervention plan
FPSO

May 23, 2019 · about 7 years ago

Regulator accepts Woodside’s Wanaea well intervention plan

Woodside’s environment plan for well intervention at the Wanaea field located offshore Western Australia has been approved by the country’s offshore regulator.

2 minutes read
  • LinkedIn
  • X
  • Email

Australian operator Woodside’s environment plan for well intervention at the Wanaea field located offshore Western Australia has been approved by the country’s offshore regulator.

Woodside submitted the plan on March 22, 2019, and the Australian offshore petroleum regulator, NOPSEMA, accepted it on Tuesday, May 21.

Woodside is planning to undertake remediation activities on the Wanaea-03 and Wanaea-11a subsea production wells between August and November 2019.

The wells are located about 120 km north west of Dampier, Western Australia and form part of the subsea production infrastructure for the Woodside-operated Okha floating production storage and offloading (FPSO) vessel. The Wanaea-03 and Wanaea-11A wells are two of 14 subsea production wells tied back to the production facility via subsea production manifold.

The Okha FPSO was commissioned in September 2011 and has been designed to extract, process, store and offload oil and export gas from the Cossack, Wanaea, Lambert and Hermes fields.

Both wells are currently suspended and while no future production is planned from Wanaea-03, Wanaea-11a is planned to be brought back online following successful remediation.

Well intervention ops

Wanaea-03 is currently suspended due to a minor dry gas leak that has previously been observed. An intervention is required to install three mechanical plugs to re-instate well integrity barriers.

Wanaea-11A is currently suspended due to the identification of a leak within the well. An intervention is planned to diagnose and repair the leak through installation of a straddle across the leak point. If this is unsuccessful, a series of mechanical plugs will be installed to permanently suspend the well.

Each of the well interventions is expected to take up to 14 days with a contingency of up to 10 days per well.

Woodside plans to use the Sapura Constructor vessel to conduct the remediation activities. The Sapura Constructor is a 117 m subsea support vessel equipped with a saturation dive system, two ROVs, well intervention equipment, a helideck and accommodation for 120 personnel.

Spotted a typo? Have something more to add to the story? Maybe a nice photo? Contact our editorial team via email .

Offshore Energy Today, established in 2010, is read by over 10,000 industry professionals daily. We had nearly 9 million page views in 2018, with 2.4 million new users. This makes us one of the world’s most attractive online platforms in the space of offshore oil and gas and allows our partners to get maximum exposure for their online campaigns.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free