Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›South Korea starts work on small LNG bunkering vessel
Infrastructure

May 8, 2020 · about 6 years ago

South Korea starts work on small LNG bunkering vessel

South Korea has started building a small liquefied natural gas bunkering vessel as part of a project backed by the Ministry of Oceans and Fisheries. A steel-cutting ceremony to mark the construction of the 500 cubic meter capacity LNG bunkering barge for coastal use was held on May 6, the ministry s

1 minutes read
  • LinkedIn
  • X
  • Email
Trans Gas Solution LNG bunkering barge

South Korea has started building a small liquefied natural gas bunkering vessel as part of a project backed by the Ministry of Oceans and Fisheries.

A steel-cutting ceremony to mark the construction of the 500 cubic meter capacity LNG bunkering barge for coastal use was held on May 6, the ministry said in a statement.

This will be a first for South Korea as the vessel features only local technology.

The vessel, that will also feature LNG-powered propulsion is slated for delivery in 2021.

It should start LNG bunkering operations in 2023 after one year of sea trials.

The LNG bunkering barge will be able to supply more than five coastal vessels on a single charge, according to the ministry.

To remind, Korean Register granted approval in principle to South Korea’s Trans Gas Solution last year for their 500-cbm LNG bunkering barge design.

The project is a part of a new coastal LNG bunkering system being developed in South Korea to serve LNG-fuelled ships.

The Ministry of Oceans and Fisheries is funding the development while the project is led by the Korea Research Institute of Ships & Ocean Engineering (KRISO).

Besides KRIS0, project participants include steel-maker POSCO, shipbuilder EK Heavy Industries, pressure vessel builder Mytec and LNG fuelling station developer Valmax.

Trans Gas Solution will oversee the development of the control system of the vessel including the cargo handling system.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

14 days ago