Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›LNG›Expansion contractor sets up base at Polish LNG terminal
LNG

July 2, 2020 · about 6 years ago

Expansion contractor sets up base at Polish LNG terminal

Polskie LNG, a GAZ-SYSTEM company, and Polish LNG terminal operator said the expansion contractor has been allowed to set up base within the facility’s area.

1 minutes read
  • LinkedIn
  • X
  • Email
Expansion contractor sets up base at Polish LNG terminal
Courtesy of Polskie LNG

Polskie LNG, a GAZ-SYSTEM company, and Polish LNG terminal operator said the expansion contractor has been allowed to set up base within the facility’s area.

Polskie LNG further noted that the expansion completion remains on schedule for December 2021, despite the effects of the Coronavirus pandemic.

To remind, the consortium comprising PORR and TGE Gas Engineering has been selected as the contractor for the Polish LNG terminal expansion project under a $481.7 million contract.

The scope of the first stage of the LNG terminal expansion program includes the design, installation, and assembly of two additional LNG regasifiers and cryogenic pumps.

The investment is aimed at extending the functionality and technical capacity of the facility, including raising the regasification capacity up to 7.5 billion cubic meters of gas per year.

“The handover of the contractor’s premises is an important stage preceding the start of construction works at the terminal. According to the investment schedule, work will begin on the implementation of foundations for additional regasifier (SCV), in autumn this year”, Krzysztof Jackowski , vice president of Polskie LNG and GAZ-SYSTEM said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

LNGInfrastructurePorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free