Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Deepwater Installation›Aquatic supports MPL Nigeria campaign
Deepwater Installation

September 14, 2020 · about 6 years ago

Aquatic supports MPL Nigeria campaign

Aquatic has completed the work scope for Marine Platforms Ltd (MPL) to support its Anyala Madu project offshore Nigeria. The Acteon company supplied the personnel and equipment to assist with the installation of multiple, different sized products. Specifically, Aquatic provided an HLS c/w 50Te tensi

2 minutes read
  • LinkedIn
  • X
  • Email
Aquatic equipment for MDL
Aquatic

Aquatic has completed the work scope for Marine Platforms Ltd (MPL) to support its Anyala Madu project offshore Nigeria.

The Acteon company supplied the personnel and equipment to assist with the installation of multiple, different sized products.

Specifically, Aquatic provided an HLS c/w 50Te tensioner and overboarding chute, as well as a 400Te reel drive system.

The reel drive system remained stored in Lagos following a previous project with MPL, concluded earlier this year.

All other equipment was mobilised with personnel in Rosyth, UK on the installation vessel ahead of transit to Nigeria.

Aquatic used its 50Te tensioner and overboarding chute to install various products from the vessel carousel as well as utilised its 400Te reel drive system to install 1.3-kilometre of 12-inch MPR from 2 x Ø10.2-metre reels.

Related Articles

Cabling

SURF’s up on Anyala and Madu fields

2 min read

Nigerian National Petroleum Corporation (NNPC) and First Exploration & Production (First E&P) recently completed SURF installation campaign on Anyala and Madu fields under OML 83 and OML 85 , offshore Nigeria.

The offshore installation campaign featured the installation, piling and grouting of subsea arch and installation of rigid riser assemblies.

The campaign also saw installation of several 10-inch – 12-inch infield static flexible flowlines and 4-inch – 12-inch dynamic flexible risers between Anyala West conductor supported platform (CSP) and FPSO and the future Madu rigid pipeline locations.

Furthermore, the project delivered setup of subsea umbilicals between Madu CSP and FPSO; Anyala West CSP and FPSO; Anyala West CSP and the future subsea gas manifold.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Deepwater InstallationFossil EnergyFPSOFPSO & VesselsSubseaBusiness Developments & ProjectsEquipmentInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1QatarEnergy’s CEO: Repairs on damaged LNG trains to take three years
  2. 2Remote operations center for unmanned survey operations opens in Singapore
  3. 3Australian oil & gas firm makes its first foray into Liberia’s deepwater arena
  4. 4Brazilian subsea services provider changes hands

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free