Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›QLNG’s 4000-cbm ATB completes sea trials
Infrastructure

November 16, 2020 · about 5 years ago

QLNG’s 4000-cbm ATB completes sea trials

Quality Liquefied Natural Gas Transport (QLNG) said its newly built 4000-cbm LNG articulated tug and Barge has completed sea trials.

1 minutes read
  • LinkedIn
  • X
  • Email
QLNG's 4000-cbm ATB completes sea trials

Quality Liquefied Natural Gas Transport (QLNG) said its newly built 4000-cbm LNG articulated tug and Barge has completed sea trials.

The vessel was built by VT Halter Marine yard and is currently underway for Elba Island Georgia where she will load LNG, completing a series of proving trials.

The vessel is the first ATB to attain a DPS-1+ notation from the American Bureau of Shipping (ABS).

DPS-1+ notation requires certain equipment, software, simulations, and studies to be conducted to show the vessel’s capability to hold in a location utilizing reference points for vessel positioning. This rigorous review allows the vessel to operate without additional support in close proximity to other vessels.

The Q4000’s DPS-1+ notation adds flexibility to deliver LNG fuel in open water and other conditions not accessible to vessels without this notation.

Upon successful gas proving trials, the Q4000 will be delivered to Shell Trading (US) Company on a long-term time charter.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago