Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Zvezda cuts steal for lead Arctic LNG 2 tanker
Clean Fuel

November 20, 2020 · about 5 years ago

Zvezda cuts steal for lead Arctic LNG 2 tanker

Russian Zvezda Shipbuilding Complex said it has cut the steel for the lead vessel in the ice-class ARC7 LNG tanker series.

1 minutes read
  • LinkedIn
  • X
  • Email
Zvezda cuts steal for lead Arctic LNG 2 tanker
Courtesy of Zvezda Shipbuilding Complex

Russian Zvezda Shipbuilding Complex said it has cut the steel for the lead vessel in the ice-class ARC7 LNG tanker series.

To remind, the vessels built by the Russian shipyard will be deployed for the Novatek-led Arctic LNG 2 project in the Russian Arctic. Zvezda will build a total of 15 Arctic LNG carriers with a further six to be delivered by the South Korean shipbuilder Daewoo Shipbuilding & Marine Engineering (DSME).

Related Articles

Clean Fuel

Novatek completes Arctic LNG 2 fleet formation

1 min read

Zvezda stressed that this is the first time liquefied natural gas carriers are being built in Russia.

Zhe ice-class ARC 7 LNG carriers are able to operate in harsh conditions. The vessels will be capable of transporting up to 172,600 cubic meters of the chilled fuel in GTT designed tanks .

Each vessel will be 300 meters long and 48.8 meters wide, and will use LNG as the main fuel.

The design of the gas carrier allows independently breaking ice more than 2 meters thick.

Zvezda noted that the funding for the 15-strong LNG carrier fleet has been provided by VEB.RF

In an earlier statement, GTT, the French LNG containment specialist noted the delivery of the vessels is scheduled for the second half of 2024 and the end of 2025.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGShipbuildingInfrastructureVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free