Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›GTT bags tank design order for LNG carrier pair
Infrastructure

December 8, 2020 · about 5 years ago

GTT bags tank design order for LNG carrier pair

French liquefied natural gas containment systems specialist GTT has been contracted to deliver tank designs for two LNG carrier newbuilds.

1 minutes read
  • LinkedIn
  • X
  • Email
GTT bags tank design order for LNG carrier pair

French liquefied natural gas containment systems specialist GTT has been contracted to deliver tank designs for two LNG carrier newbuilds.

GTT said in its statement that the order was placed by the South Korean shipbuilding major Hyundai Heavy Industries.

The vessels are being built on behalf of a European shipowner.

Each vessel will be capable of transporting up to 174,000 cubic meters of liquefied natural gas. GTT will design the tanks of the vessels, which will be fitted with the Mark III Flex membrane containment system.

Deliveries of the vessels are scheduled for the fourth quarter of 2022 and the third quarter of 2023 respectively.

It is the second order GTT has secured in December 2020 following a tank design order for six ARC7 ice-class LNG carriers.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

18 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

18 days ago