Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›AG Ems’ Münsterland arrived for LNG conversion
Infrastructure

January 19, 2021 · about 5 years ago

AG Ems’ Münsterland arrived for LNG conversion

The ferry Münsterland has arrived at the dock of shipyard Royal Niestern Sander in Delfzijl, Netherlands, for LNG conversion.

1 minutes read
  • LinkedIn
  • X
  • Email
AG Ems' Münsterland arrived for LNG conversion

The ferry Münsterland has arrived at the dock of shipyard Royal Niestern Sander in Delfzijl, Netherlands, for LNG conversion.

Royal Niestern Sander designed and built a completely new aft ship with LNG tank and equipment installed for Münsterland . Münsterland is the passenger ship from 1986, belonging to German ferry operator AG Ems.

The new equipment includes dual-fuel engines, LNG storage tanks, propulsion systems, all LNG installations, pipelines and other systems.

The completely new stern will replace the existing stern of the ship. Niestern Sander announced on social media that the current aft ship is expected to be removed this week.

In addition to emission benefits, the reduction of hull resistance and less engine power needed to sail at the same speed, Münsterland’s LNG conversion will also offer advantages in terms of material used. The old stern with old systems and installations is dismantled by Niestern Sander in a sustainable manner and recycled as much as possible.

AG Ems already has two LNG vessels named Ostfriesland and Helgoland . Ostfriesland is the first ferry in Europe converted to LNG and Helgoland is Germany’s first newbuild LNG-powered ferry.

Royal Niestern Sander yard follows a conversion method that offers the possibility of reducing the idle time of an existing ship to a minimum.

The project is backed by the European Regional Development Fund of the European Union.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

19 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

19 days ago