Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Zvezda cuts steel for third Arctic LNG 2 tanker
Infrastructure

April 14, 2021 · about 5 years ago

Zvezda cuts steel for third Arctic LNG 2 tanker

The Zvezda Shipbuilding Complex in the Russian Far East has cut the first steel for a new Arc7 ice-class LNG tanker for the Arctic LNG 2 project.

2 minutes read
  • LinkedIn
  • X
  • Email
Zvezda cuts steel for third Arctic LNG 2 tanker

The Zvezda Shipbuilding Complex in the Russian Far East has cut the first steel for a new Arc7 ice-class LNG tanker for the Arctic LNG 2 project.

The shipyard noted that the construction of the third vessel in the series is financed by VEB.RF. Zvezda shipyard and VEB.RF signed a deal for the construction of 15 Arctic LNG tankers.

The vessels will be operated under long-term time charter agreements between Sovcomflot and Smart LNG, a joint venture between Novatek and Sovcomflot, and the Arctic LNG 2 project.

The new Arc7 ice-class tankers are designed to ensure year-round navigation along the Northern Sea Route, including its Eastern part, and will have increased icebreaking and maneuvering characteristics as compared to the previous type of Arctic tankers currently used by the Yamal LNG project.

Once completed the vessel will be 300 meters long and will have the capacity to transport up to 172,600 cubic meters of the chilled fuel, and feature Mark III cargo containment system.

The Novatek-led Arctic LNG 2 project envisages constructing three LNG liquefaction trains of 6.6 million tons per annum each, as well as a cumulative gas condensate production capacity of 1.6 million tons per annum.

The total LNG capacity of the three liquefaction trains will be 19.8 million tons.

The project utilizes gravity-based structure (GBS) platforms to reduce overall capital cost and minimize its environmental footprint in the Arctic zone of Russia.

The project’s participants include Novatek (60 per cent), Total (10 per cent), CNPC (10 per cent), CNOOC (10 per cent) and the consortium of Mitsui and JOGMEC (10 per cent).

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

20 days ago

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

20 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean cable maker takes delivery of its second cable laying vessel
Business & Finance

South Korean cable maker takes delivery of its second cable laying vessel

20 days ago
LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

20 days ago