Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›BP flows first gas from third stage of West Nile Delta project
Business Developments & Projects

April 27, 2021 · about 5 years ago

BP flows first gas from third stage of West Nile Delta project

Oil major BP has started producing gas from the Raven field, the third stage of the large West Nile Delta (WND) development off the Mediterranean coast in Egypt.

2 minutes read
  • LinkedIn
  • X
  • Email
BP

Oil major BP has started producing gas from the Raven field, the third stage of the large West Nile Delta (WND) development off the Mediterranean coast in Egypt.

The $9 billion WND development includes five gas fields across the North Alexandria and West Mediterranean deepwater offshore concession blocks in the Mediterranean Sea. BP and its partners, working with the Ministry of Petroleum, have developed the WND in three stages.

Raven follows the Taurus-Libra and Giza-Fayoum projects, which started production in 2017 and 2019 respectively. It produces gas to a new onshore processing facility, alongside the existing West Nile Delta onshore processing plant.

BP said on Monday that the Raven field was currently producing around 600 million standard cubic feet of gas per day (mmscf/d). At its peak, the Raven field has the potential to produce 900 mmscf/d and 30,000 barrels per day of condensate.

Bernard Looney , BP CEO, said: “ Completing this major multi-stage development in the face of many challenges is testament to BP’s long-term commitment to Egypt and our excellent working relationships with partners and the government.

“ West Nile Delta will make an important contribution to meeting Egypt’s growing energy needs, by providing a cost-competitive and resilient gas supply from the country’s own resources ”.

Karim Alaa , BP regional president for North Africa, added: “ The safe start-up of Raven in an extremely difficult period would not have been possible without commitment and close co-operation from the team.

“ Working together with the Ministry of Petroleum and our partners we can now explore the potential use of the West Nile Delta facilities for developing future infill and nearby exploration opportunities ”.

In total, the WND development includes 25 wells producing gas to the onshore processing plant via three long-distance subsea tie-backs.

The onshore facilities – including the new Raven facility – now have a total gas processing capacity of around 1.4 billion standard cubic feet of gas per day. All gas produced is fed into Egypt’s national grid.

BP is the operator and has an 82.75 per cent stake in the West Nile Delta development, with Wintershall Dea holding the remaining 17.25 per cent interest.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsExploration & ProductionInfrastructureProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago