Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Borr rig spuds Dutch North Sea well for Kistos
Fossil Energy

November 22, 2021 · about 4 years ago

Borr rig spuds Dutch North Sea well for Kistos

Borr Drilling’s jack-up drilling rig has spudded Kistos’ Q11-B well in the Dutch North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email
Borr Drilling Kistos Dutch North Sea
Borr Drilling’s Prospector I jack-up rig; Source: Borr Drilling

A Borr Drilling-owned jack-up rig has started drilling operations on Kistos’ Q11-B well located in the Dutch North Sea.

Borr Drilling’s Prospector-1 jack-up drilling rig arrived at the Q10-A field in July 2021 for a work programme scheduled to last around four months. This entails an appraisal well of the Q11-B gas discovery, a flow test of the Vlieland light oil discovery, a sidetrack of the Q10-A-04 well and a re-perforation of a well on the Q10-A field to boost the output.

Kistos confirmed on Monday that the Prospector-1 jack-up rig had started drilling the Q11-B appraisal well. This drilling rig was built in 2013 and will be under contract with Kistos until November , since it is scheduled to work for Neptune from December 2021.

The Q11-B appraisal well is anticipated to take a minimum of six weeks to drill and test. Kistos is the operator and holds a 60 per cent working interest.

The Q11-B discovery is located in the licence block Q11, approximately 13 kilometres offshore. This gas field was discovered in 1969, and it is intended that a Q11-B field development could mimic the Q10-A development, with a normally unmanned installation incorporating renewable power generation and provision for four producing wells.

The company plans to suspend the well for future use in a Q11-B development and has estimated 2C resources for this accumulation of between 67 – 155 Bcf net. The figures were independently audited by Sproule. These will be refined following a review of all the data from the forthcoming well.

If this campaign meets expectations, it is anticipated to lead to Q11-B coming onstream before the end of 2023. All these activities are designed to enhance production from the existing Q10-A well stock, as the firm expects the Q10-A gas field to exit 2021 with gross production of more than 2.0 mmsm3/d.

Previously, Kistos explained that success with the forthcoming Vlieland oil test and/or the Q11-B appraisal well could result in a further significant uplift in production by the mid-2020s.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasRigsBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionInfrastructureProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1North Sea appraisal ops up the oil & gas discoveries’ projected size
  2. 2Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  3. 3CNOOC keeping Worley busy on its North Sea assets for five more years
  4. 4Fit-out of NeuConnect’s converter stations in progress

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free