Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Zvezda cuts steel for new Arctic LNG 2 carrier
Infrastructure

December 27, 2021 · about 4 years ago

Zvezda cuts steel for new Arctic LNG 2 carrier

Russian shipyard Zvezda Shipbuilding Complex held a steel-cutting ceremony for the third ARC 7 icebreaking LNG carrier for the Arctic LNG 2 project.

2 minutes read
  • LinkedIn
  • X
  • Email
Zvezda cuts steel for new Arctic LNG carrier

Russian shipyard Zvezda Shipbuilding Complex held a steel-cutting ceremony for the third ARC 7 icebreaking LNG carrier for the Arctic LNG 2 project.

Zvezda started cutting steel for the sixth out of 15 ARC 7 ice-class LNG carriers. These Sovcomflot-ordered ships will serve the Arctic LNG 2 project; thus allowing the year-round transport of LNG along the Northern Sea Route to the Asian Pacific region.

In addition, South Korean shipyard Samsung Heavy Industries provides technological support in the construction of these carriers.

As these vessels use LNG as the main fuel, they are specifically demonstrating increased environmental safety.

SSK Zvezda also reminds it holds an international license and is the only Russian shipyard that can build LNG carriers with GTT’s Mark 3 membrane system.

Ice-class ARC 7 LNGC can transport LNG while operating in harsh climatic conditions. Moreover, the design allows it to independently break the ice that is more than two metres thick.

The length of the vessel is 300 metres, and the width is 48.8 metres. The capacity of cargo tanks amounts to 172,600 cubic metres.

The vessel is equipped with three unique rudder propellers, produced by a joint venture between Rosneft and GE.

The ships will serve Novatek for the Arctic LNG 2 project. The project includes the construction of three LNG trains, with a capacity of 6.6 mtpa of LNG each.

The icebreakers will go under long-term time charter agreements between Sovcomflot (for a pilot vessel) and SMART LNG (a subsidiary of Sovcomflot Group and Novatek, for the remaining 14 vessels) with Arctic LNG 2 (a subsidiary of NOVATEK).

Zvezda will deliver the vessel in 2024.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

InfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

LNG vessel; Source: GTT
Business & Finance

GTT’s new LR-approved NO96 criteria expand LNG carrier design flexibility

23 days ago