Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Jiangnan orders GTT tank design for PIL’s new LNG-fueled containerships
Clean Fuel

March 18, 2022 · about 4 years ago

Jiangnan orders GTT tank design for PIL’s new LNG-fueled containerships

Chinese shipyard Jiangnan has ordered GTT tank design for four very large LNG-fueled container vessels on behalf of Pacific International Lines (PIL).

2 minutes read
  • LinkedIn
  • X
  • Email
Jiangnan orders GTT tank design for PIL's new LNG-fueled containerships
Illustration; Courtesy of PIL

Chinese shipyard Jiangnan has ordered GTT tank design for four very large LNG-fueled container vessels on behalf of Pacific International Lines (PIL).

GTT received this order from Jiangnan for the vessels that will be able to carry 14,000 containers each. The shipyard ordered this on behalf of Pacific International Lines, a shipping line in Asia.

On 4 March 2022, PIL said it signed the contract with Jiangnan for these vessels. The vessels will have dual-fuel engines which can run on both LNG or low sulfur fuel oil. The ship quartet will also be equipped with an ammonia intermediate ready fuel tank, making it possible to retrofit the vessels.

The LNG fuel tank of each vessel will offer a capacity of 13,800 cubic metres. It will also feature the Mark III membrane containment system.

These tanks will include unique features; aiding in a potential conversion of these vessels to ammonia. Therefore, PIL will have greater operational flexibility in case of changes in environmental regulations.

In addition to the engineering services and technical assistance, GTT will help PIL through the first LNG-fueled project. This includes commissioning of the LNG tank, first LNG bunkering operations, as well as further specific LNG operations.

Moreover, GTT will provide LNG training for the crews, supported by its proprietary G-Sim training simulator. PIL will also have the HEARS emergency response service with 24/7 technical assistance available.

The ships will also feature the “GTT Digital” platform.

Jiangnan will deliver the containerships between the second half of 2024 and the first half of 2025. When delivered, the vessels will become the largest container vessels in PIL’s fleet and the first units in the fleet to run on LNG.

Related Articles

Clean Fuel

GTT: Ukraine-Russian situation could affect LNG tank orders

2 min read

Philippe Berterottière , CEO of GTT, declared: “We are convinced that LNG is the solution of choice to reduce the shipping industry’s carbon footprint. The ammonia compatibility of the vessels ordered also offers greater flexibility and demonstrates GTT’s continued commitment to securing ship owners’ investments in a context where they must constantly adapt to environmental regulations.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGShipbuildingBusiness Developments & ProjectsInfrastructureProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Expro lines up 14-well Canadian offshore life-extension campaign
  2. 2TotalEnergies greenlights gas project to feed one-third of Nigeria LNG train expansion
  3. 3Construction ramps up at Orkney Islands’ first link to UK mainland
  4. 4Perenco on offshore platform electrification quest to power Brazil’s shallow-water fields from shore

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free