Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›FSG cuts first steel for SeaRoad’s LNG-powered RoRo
Business Developments & Projects

May 27, 2022 · about 4 years ago

FSG cuts first steel for SeaRoad’s LNG-powered RoRo

German shipbuilder Flensburger Schiffbau-Gesellschaft (FSG) has cut the first steel of a roll-on/roll-off (RoRo) vessel ordered by Australian shipping company SeaRoad.

2 minutes read
  • LinkedIn
  • X
  • Email
FSG

German shipbuilder Flensburger Schiffbau-Gesellschaft (FSG) has cut the first steel of a roll-on/roll-off (RoRo) vessel ordered by Australian shipping company SeaRoad.

On 20 May, FSG CEO Philipp Maracke and Tony Johnson, Technical Marine Manager of SeaRoad, jointly pushed the button to start the laser cutting machine.

The first sheet of steel belonged to module H23 from section 71, the future living quarters for the ship’s crew in the deckhouse.

Ordered in September last year, the newbuild will be powered by liquefied natural gas (LNG), featuring two dual-fuel m ain engines and three auxiliary engines. It is scheduled for delivery to SeaRoad in the fourth quarter of 2023.

With a gross tonnage of 43,100 tonnes, the contracted RoRo vessel will have a length of 210 metres and a width of 29.30 metres.

Additionally, it will have 3,722 lane metres available for the carriage of trailers / freight units, plus capacity for 101 cars (= 4,227 lane metres in total). A special requirement for the vessel is the capability to transport heavy cargo with a unit weight of up to 100 tonnes.

The order is worth more than €100 million ($107.3 million). The funding partner for the project is the Commonwealth Bank of Australia.

The new RoRo vessel will operate on Bass Strait between Devonport, on the island of Tasmania, and Melbourne, Victoria on mainland Australia.

Earlier this month, MacGregor, part of Cargotec, was selected to supply RoRo equipment for the newbuild.

The scope of supply includes the design, fabrication, and installation of a large stern ramp and ramp cover. These have a capacity for heavy cargo with a unit weight of up to 100 tonnes.

Follow Offshore Energy’s Green Marine on social media:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago