Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Enagas in key step for El Musel LNG terminal start-up
Business Developments & Projects

July 12, 2022 · about 4 years ago

Enagas in key step for El Musel LNG terminal start-up

Spanish energy company Enagás has obtained the administrative authorisation for the El Musel LNG plant, a key step for the start-up of the terminal, which could be operational within six to eight months.

2 minutes read
  • LinkedIn
  • X
  • Email
Enagas in key step for El Musel LNG terminal start-up

Spanish energy company Enagas has obtained the administrative authorisation for the El Musel LNG plant, a key step for the start-up of the terminal, which could be operational within six to eight months.

El Musel LNG is a proposed liquified natural gas (LNG) terminal in Asturias, Spain. The terminal was constructed back in 2012, However, it remained idle until this year. In April 2022, the Spanish government announced plans to open the terminal as it was looking for alternative ways to break its dependence on Russian gas imports.

According to Enagas, the terminal has the capacity to store 300,000 cubic metres (cbm) of LNG. It is divided into two tanks of 150,000 cbm each. It also has berthing and unloading facilities designed for the world’s largest LNG carriers, the QMAX, of up to 266,000 cbm.

This authorisation has been granted following a favourable report from the National Commission on Markets and Competition (CNMC). According to Enagas, it is a key step for the start-up of the LNG terminal after the Ministry approved the Environmental Impact Statement (EIS) for this infrastructure in May 2021.

The process for its start-up continues with the processing of the recognition of the economic regime by the CNMC (a special regime so that it can be used as a plant for LNG logistics service).

Enagás CEO Arturo Gonzalo said that “once this process is completed, the plant could be operational for logistics use within six to eight months.” He also added that “more than 100 LNG carriers a year can be unloaded and loaded at the Gijón terminal, which represents a contribution of up to eight billion cubic metres”.

Enagas also said the logistical use of the El Musel LNG plant will contribute to the security of supply in Europe. This is, in particular, relevant in the current European context of reducing dependence on Russian gas, as envisaged in the European document REPowerEU .

The terminal allows for the unloading of LNG carriers from various producer countries and the fast loading of ships to different European destinations.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructurePorts & LogisticsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

15 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

15 days ago