Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Zvezda launches new LNG carrier for Novatek’s Arctic LNG 2 project
Clean Fuel

August 8, 2023 · about 3 years ago

Zvezda launches new LNG carrier for Novatek’s Arctic LNG 2 project

Russian shipyard Zvezda Shipbuilding Complex has launched a new ice-class ARC7 LNG carrier for the Arctic LNG 2 project. According to Zvezda, the vessel was named Sergei Witte and has a capacity of 172,600 m3. It is the third unit in a series of fifteen LNG carriers ordered by Sovcomflot and being b

2 minutes read
  • LinkedIn
  • X
  • Email
Zvezda launches new LNG carrier for Novatek’s Arctic LNG 2 project
Courtesy of Zvezda

Russian shipyard Zvezda Shipbuilding Complex has launched a new ice-class ARC7 LNG carrier for the Arctic LNG 2 project.

According to Zvezda, the vessel was named Sergei Witte and has a capacity of 172,600 m3. It is the third unit in a series of fifteen LNG carriers ordered by Sovcomflot and being built to serve Novatek’s Arctic LNG 2 project.

The first two ships were launched earlier and are undergoing fitting work.

The LNG carriers in this series have a length of 300 metres, a width of 48,8 metres with a deadweight of 81,000 tons. The propulsion system consists of three azimuth units with a total capacity of 45 MW.

The ships will fly the Russian flag, operating under long-term time charter agreements between Sovcomflot (for a pilot vessel) and SMART LNG (a subsidiary of Sovcomflot Group and Novatek, for the remaining 14 vessels) with Arctic LNG 2 (a subsidiary of Novatek).

Zvezda and the companies of the VEB.RF group signed the contracts for the construction of these ships from December 2019 to July 2020. The shipyard then began building the first ship in November 2020.

Once delivered, the vessels will allow the year-round transport of LNG along the Northern Sea Route to the Asian Pacific region.

Located on the Gydan peninsula, Novatek’s Arctic LNG 2 project includes the construction of three LNG trains, with a capacity of 6.6 million tonnes per annum (mtpa) of LNG each.

READ MORE Zvezda starts 7th Arctic LNG 2 carrier construction TotalEnergies takes $4.1 bln impairment charge on Russian Arctic LNG 2 project Follow Offshore Energy’s Clean Fuel:

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelGreen MarineLNGShipbuildingBusiness Developments & ProjectsInfrastructureVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Technip Energies picks up assignment on Mexican LNG project
  2. 2Expansion move puts US LNG project on path for almost twofold capacity boost
  3. 3Petrobras widens its African offshore portfolio with multiple blocks in Côte d’Ivoire
  4. 4WATCH: Island Offshore’s second ocean energy construction vessel goes to Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free